2. From below, install a firestop in each ceiling/
floor separation through which the chimney
will pass. At the attic level, install an attic
radiation shield from above (
Figures 22a
and 22b
)
.
3. For Secure Temp
S2100+ / Nova Temp
/ Secure Temp
GX chimneys, place
the first chimney length on the fireplace.
To lock it in place, turn 1/4 of a turn clock-
wise. With the ACBI chimney, you must
use a starter section before installing the
first chimney length
(
Figure 23
)
. Continue
installing chimney lengths making sure to
lock each length in place.
4. Every time the chimney passes through a ceil-
ing or a wall, install the appropriate firestop.
When you reach the desired height, install the
roof support (Refer to instructions included
with the support). For an ACBI chimney use
an universal support AC10SU.
5. Put the roof flashing in place and seal the
joint between the roof and the flashing with
roofing pitch (see
Figures 24 and 25
)
. For
sloping roofs, place the flashing under the
upper shingles and on top of the lower
shingles. Nail the flashing to the roof, using
roofing nails.
6. Place the storm collar over the flashing, and
tighten it with the bolt supplied. Finally, seal
the joint between the storm collar and the
chimney, using silicone caulking.
7. Install the chimney cap. Once the chimney
cap is in place, the roof flashing can be
washed with a solvent or vinegar and then
painted with rust-proof paint.
Figure 21 - Roof Framing
Figure 22a
S2100 /
Solid Packed Pipe
ACBI
Air Cooled Pipe
Figure 22b
Figure 23
CHIMNEY INSTALLATION
MODEL ACBI
Rain Cap
Collar
Flashing
Attic Radiation
Shield
Firestop
Universal Support
ACBI Starter Section
ACBI7SB
or
ACBI7SB30
Note: Outside air kits must be
installed for both fireplace and
ACBI chimney.
Outside Combustion
Air Kit
Chimney Outside
Air Intake
(required when
using AC chimney)
Attic Radiation Shield
Attic Radiation
Shield
Radiation Shield
Firestop
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.