17
Figure 12
Figure 13
3.5
HOT AIR DUCTING INSTALLATION
Different hot air ducting systems can be installed with the BIS ULTRA:
-
Gravity kit
-
Forced air kit (Not EPA approved) (p. 18)
-
As is – Heat circulating
3.5.1
Gravity Kit
Two kits are available :
Double hot air outlet including :
(See Figure)
- 2 telescopic lengths 8" I.D.
- 2 90º elbows 8" I.D.
- 2 hot air outlet kits
(louvers and frames)
- 2 adaptors
See components list on last page
Single hot air outlet including :
(See Figure)
- 2 6" lengths 8" I.D.
- 1 hot air outlet kit
(box, louver and frame)
- 2 adaptors
Summary of Contents for EPA BIS ULTRA
Page 2: ...Printed in Canada Rev 9 April 2007 PIBISULTRAEPA ...
Page 7: ...2 2 CERTIFICATION LABEL ...
Page 10: ...5 ...
Page 20: ...15 Figure 7 Figure 9 Figure 8 Figure 10 ...
Page 30: ...25 Figure 28 NOTE THE OUTSIDE AIR KIT IS MANDATORY FOR BOTH FIREPLACE AND CHIMNEY ...
Page 35: ...30 Figure 31 Figure 32 ...
Page 37: ...32 ...