SEEBURG acoustic line
12
Assembly and disassembly – Flown operation
Assembly and disassembly of the Galeo system must be carried out by
qualified personnel only. Every technician or staff member working with the
system must have access to this user manual and the structural analysis
certificate and be familiar with the most essential contents.
Only use chain hoists permitted in accordance with BGV C1 or BGV D8+
respectively if there are any persons sitting or standing under the loudspeaker
system. Ensure that chains do not become entangled with ball lock pins or
cables. Bypass the motor with a steel cable (dead hung) or ensure that a
second, independent and sufficiently dimensioned securing device is available.
Only use accessories that conform to BGV C1 requirements and carry out all
other work in compliance with BGV A1 or BGV C1 regulations respectively.
These
trade
regulations
can
be
viewed
on
the
internet
at
www.arbeitssicherheit.de
Do not assemble an array of Galeo loudspeakers that is not covered by the
structural analysis certificate or has not been separately certified by a qualified
person.
The structural analysis certificate contains the following cases for flown
operation using the
Galeo flying frame
.
•
up to 8 Galeo on pinpoint 6…10 (freely suspended)
•
up to 12 Galeo on pinpoint 1 with up to 20° overall inclination angle
/curving via an additional vertical bracing at the centre of gravity.
•
Up to 16 Galeo on pinpoint and use of the 0°, 2°,4°, and 6° insertion
points.
The structural analysis certificate contains the following cases for flown
operation using the
Galeo Sub flying frame
:
•
up to 2 Galeo Sub on pinpoint 6
•
up to 6 Galeo Sub or 2 Galeo Sub and 8 Galeo on pinpoint 1 and 12
respectively, with a double-strand suspension system set at a 60°
bridle angle.
Using the system at wind force 8 and above is not permitted. From wind force 6
operation is to be discontinued and the complete array placed on the ground
and firmly secured.