BREEZAIR EXQ/EZQ/EXS EVAPORATIVE COOLERS INSTALLATION MANUAL
|
7
To separate the transition from the pallet cut off the front
tabs and the rear flap.
Note!
These two pieces of timber will form a height
gauge to ensure the finished cooler is correctly
positioned.
Note!
Some nails protruding from the timbers may
be added to help locate them. For roof slopes greater
than 45° add 15mm packer to top gauge.
PREPARING THE DROPPER
Cut a 50mm diameter cable exit hole in the dropper then
fit and screw the cable grommet into position. Locate the
hole so the cables will not interfere with the operation of
the weather damper.
Before transporting to the roof, temporarily screw the
transition to the dropper using a screw in each corner.
Affix gauge timbers under the top and bottom edges
of the transition with 30mm screws supplied
Keep the pallet to create a gauge for locating the
transition piece and dropper.
ILL1653-A
ILL1646-A
ILL1654-A
ILL1655-A
ILL951-B
Remove cooler from the transition by removing the
4 internal tab screws (2 at the front and 2 at the rear),
then releasing the 9 clips.
EZQ DISASSEMBLY
EZQ MODEL ONLY
EXTRA NOTES FOR EZQ MODEL ONLY