Warranty Service
Australia 1-300-650-644
seeleyinternational.com
612195L Version 25-3-15
seeleyinternational.com.au
Name of Technician and company
(Print)
Signature of Technician
Date of attendance
Year
2
4
8
6
10
Maintenance Schedule
Cabinet and components
Cabinet
Heat exchanger
Electrical connections
Combustion air inlet louvres
Electrical
Electrical wiring
Room fan motor / impellor
Thermocouple voltage
Overtemp switch
Operation
Start up and run sequence
Control operation
Complete ignition
Gas inlet pressure
Gas test point pressure
High
General installation
Rear register
Flue system, cowl
Gas, burners, ignition
Main burner and injector
Pilot gas rate
Pilot ignition / ignition electrode
Gas test point pressure
Low
Thermostat operation
Draught diverter (NOTE 1)
kPa
kPa
kPa
kPa
kPa
kPa
kPa
kPa
kPa
kPa
kPa
kPa
kPa
kPa
kPa
Action taken key:
= Inspected and working correctly no action required
A = Adjustment of part
C = Cleaning of part
R = Replaced part
Pilot burner and injector
It is a condition of your warranty cover that the items in the Schedule below are checked (and action taken as required)
every two (2) years after the date of installation by a qualified, licenced technician, and that the Schedule is properly
filled out (ie names, signature, date, and action taken). Even after the warranty period expires, please continue to have
the product maintained every two years as per the items in the Schedule. This will help to prolong the life of the product
and keep it running efficiently.
It is the policy of Seeley International to introduce continual product improvement. Accordingly, specifications are subject to change without notice.
Please consult with your dealer to confirm the specifications of the model selected.
To owner/user: please note that as explained in your Warranty Card, installation is not covered by the warranty (for example, electrical and gas
connections to the Wall Furnace). However, we still require that you have these things checked, because they can affect the performance (and/or
safety) of the heater. This is why we have included them in the Maintenance Schedule. Further, routine maintenance may be required more
frequently in non-domestic applications or when operating in adverse environmental situations. It is your obligation to ensure that you comply with
these requirements.
Electrical and gas connections
NOTE 1:
Check operation of flue and draft diverter in accordance with detailed instructions included in AS/NZS 56001.