INSTALLATION AND SET UP PROCEDURES.
The equipment (motor + controller) is ready for operation ; connect the line 115VAC supply source with the earth connection (the
section of additional line wires must be > 0,75mm²).
DO NOT USE THE DRIVE SYSTEM IN AN EXPLOSIVE ATMOSPHERE
DANGER :
If changes on the calibrations are needed they must be done by qualified electrical maintenance personnel :
THE
TRIMMERS MUST BE ADJUSTED WITH INSULATED SCREW DRIVES
.
RXI CALIBRATION :-
START THE MOTOR AND WAIT FEW MINUTES FOR THE THERMAL STABILIZATION
- MEASURE THE SPEED WITHOUT THE LOAD
- LOAD THE MOTOR AND CALIBRATE THE TRIMMER TILL THE SAME SPEED WILL BE OBTAINED
If changes on the internal wires connections or fuse exchange are needed
TAKE-OFF THE MAIN SUPPLY BEFORE ANY
OPERATION.
AUTOMATIC RESTART OF THE CONTROLLER MAY OCCUR IF THE LINE POWER IS TEMPORARY LOST.
CONNECTION OF EXTERNAL DEVICES : PAY ATTENTION TO THE RIGHT CONNECTIONS OF THE INHIBIT AND 115VAC
SUPPLY
TROUBLESHOOTING.
MOTOR NOT RUN
-
CHECK THE MAIN POWER CONNECTION
-
ENSURE THE MAIN SWITCH TO “ON”
-
ENSURE INHIBIT OPEN
-
CURRENT LIMIT (CHECK THE CAUSE OF MOTOR OVERLOAD)
BLOW FUSE
(GREEN LED OFF)
-
DAMAGE WIRES
-
WRONG LINE VOLTAGE
-
MOTOR SHORT CIRCUIT
NO SPEED CONTROL
-
CHECK THE POTENTIOMETER WIRES
-
CHECK THE CONNECTOR TO EXTERNAL SPEED
ALARM
(RED LED ON)
-
CHECK THE LOAD TO ENSURE THE RATED POWER OPERATION OF THE
MOTOR AND IF THE ROTOR IS LOCKED
5
Summary of Contents for 7S115C
Page 1: ...7S115C_USE_1 doc DATE 25 08 2003 REV 0 1 1 ...
Page 6: ...6 ...
Page 7: ...7 ...
Page 8: ...8 BRUSH CHANGE OPERATION ...