Page 4.4
4.0 Prior to Operation
Prior to Operation for 548.04 \ 05.2010 \
You have received a Soldering System. For all additional
deliveries please refer to the delivery note.
Unpacking the system securely.
Attention, accident hazard
The system weights is approx. 65 kg. Remove the
system from the pac kaging with 2 people. Otherwise there
is dan ger of accidents.
Check the packaging immediately together with the
forwarding agent for possible transportation damage.
If there is any transportation damage, document the
extent of damage on the delivery note of the forwar-
ding agent and sign this note
only
under protest.
Contact us and the transportation insurance company
immediately.
Attention, danger
Do not assemble the system and do not connect it to the
power supply if any damages are recognizable.
Due to the
damage there is a danger to your life.
Make sure the contents correspond to the statements
made on the note of delivery.
If delivery and delivery note do not agree, please con-
tact us immediately.
Keep the packaging for transportation and service.
After having unpacked the system and ensured
yourself about the perfect conditions as well as about
the correct and complete delivery, you can start trans-
porting the system to the designated place of operati-
on.
Unpacking and controlling the parts of delivery
Parts of de li ve ry
Unpacking the
system
What to do in
case of da ma ge
?
Checking parts of
de li ve ry
Summary of Contents for 548.04
Page 14: ...Page 1 2 1 0 Preface Preface for 548 04 05 2010 ...
Page 24: ...Page 2 2 2 0 Safety Instructions Safety Instructions for 548 04 05 2010 ...
Page 36: ...Page 3 2 3 0 Quick Reference Guide Quick Reference Guide for 548 04 05 2010 ...
Page 54: ...Page 3 20 3 0 Quick Reference Guide Quick Reference Guide for 548 04 05 2010 ...
Page 56: ...Page 4 2 4 0 Prior to Operation Prior to Operation for 548 04 05 2010 ...
Page 68: ...Page 4 14 4 0 Prior to Operation Prior to Operation for 548 04 05 2010 ...
Page 70: ...5 0 Operation of System Page 5 2 Operation of System for 548 04 05 2010 ...
Page 90: ...Page 6 2 6 0 Production Production for 548 04 05 2010 ...
Page 96: ...Page 6 8 6 0 Production Production for 548 04 05 2010 ...
Page 98: ...Page 7 2 7 0 Measurement Measurement for 548 04 05 2010 ...
Page 106: ...Page 7 10 7 0 Measurement Measurement for 548 04 05 2010 ...
Page 108: ...Page 8 2 8 0 System Settings System Settings for 548 04 05 2010 ...
Page 116: ...Page 9 2 9 0 Maintenance Maintenance for 548 04 05 2010 ...
Page 142: ...10 0 Technical Appendix Page 10 2 Technical Appendix for 548 04 03 2010 ...
Page 145: ...Page 10 5 10 0 Technical Appendix Technical Appendix for 548 04 03 2010 Power unit 271 02 A9 ...
Page 146: ...10 0 Technical Appendix Page 10 6 Technical Appendix for 548 04 03 2010 Mains filter ...
Page 147: ...Page 10 7 10 0 Technical Appendix Technical Appendix for 548 04 03 2010 Power board 238 01 A1 ...
Page 148: ...10 0 Technical Appendix Page 10 8 Technical Appendix for 548 04 03 2010 ...
Page 150: ...11 0 Accessories Page 11 2 Accessories 548 04 03 2010 ...
Page 161: ...Page 12 1 12 0 Notes ...
Page 162: ...12 0 Notes Page 12 2 ...
Page 163: ...Page 12 3 12 0 Notes ...
Page 164: ...12 0 Notes Page 12 4 ...
Page 165: ...Page 12 5 12 0 Notes ...
Page 166: ...12 0 Notes Page 12 6 ...