6 - 5 INPUT TEST
When INPUT TEST is selected, the MONITOR will show the following, allowing you to
watch the status of each switch. On the screen, periodically check the status of each switch.
1.> By pressing each switch, if the display on the right-hand side of
the name of each switch changes to ON from OFF, the SW and the
wiring connections are satisfactory.
2.> Open the COIN CHUTE DOOR and insert a coin from the COIN
ENTRY to check the COIN CHUTE SW.
6 - 6 OUTPUT TEST
Choose OUTPUT TEST to cause the following lower screen to appear. In the test,
periodically adjust the projector and check the status of each lamp.
Choose OUTPUT TEST to have the MONITOR screen shown left to
appear. This screen allows status to be checked. Periodically check
the lamp status in this mode.
Press the SERVICE BUTTON to move the arrow to the desired lamp
test item.
Press the TEST BUTTON. If the dispay to the right of the lamp
changes to ON from OFF, the lamp and wiring connection are
satisfactory.
Choose EXIT and press the TEST BUTTON to return to MENU
MODE.
Summary of Contents for House of the Dead
Page 1: ...Upright Version Operators s Manual...
Page 42: ...NANAO MONITOR 2001 5242 24 04 24K...
Page 47: ...13 2 COMPOSITION OF GAME BOARD GAME BD THE HOUSE OF THE DEAD 610 0396 13054...
Page 48: ...14 DESIGN RELATED PARTS...
Page 55: ...6 ASSY SPEAKER 130 5152 ITEM NO PART NO DESCRIPTION 101 130 5152 SPEAKER BOX MINI DOME 12W...
Page 59: ......