Section 2: BATT Fittings
Installation of Fittings
2019 BATT Diesel/Jet Fuel Operations Manual
(Version K)
6
We Engineer Solutions
The following is a guideline for how much Loctite 55 to use per thread size:
6.
Cut the required length off and smooth the loose end onto the pitches of the pipe thread.
7.
Engage BATT fitting.
Caution
Do not over apply the pipe sealing cord. Excessive material tends to be pushed off as the thread
connection is assembled and it also becomes mechanically more difficult to complete the
engagement.
Thread Size Number of Turns (wraps)
1”
8 to 12
1-1/2”
10 to 15
2”
15 to 25
3”
25 to 35
Important Note
Loctite 55 can be adjusted up to 90 degrees after tightening.