Semi-Annual Inspection Log
2019 BATT Diesel/Jet Fuel Operations Manual
(Version K)
44
We Engineer Solutions
Semi-Annual Inspection Log
To be performed every six months (± two weeks) from tank's wet date. Inspect the following:
•
Zipper (for serviceability, tightness, cracks and other evidence of failure)
•
Space between the inner and outer tanks (within reasonable reach, for signs of fuel leak-
age, fabric deterioration, distortion, discoloration, hardening, wearing, cuts, scratches,
cracks and other evidence of failure).
Tank manufacturing date: _________________________ Tank wet date: _________________________
N
o
Date
Performed
by
(name/signature)
Notes
(brief
assessment
of
BATT
condition)
1
2
3
4
5
6
7
8
9
SEI
BATT
Inspection
after
5
years
operation
Completed
(date):___________________(Filled
by
SEI)
10
11
12
SEI
BATT
Inspection
after
7
years
operation
Completed
(date):___________________(Filled
by
SEI)
13
14
15
BATT
end
of
service
life