7
START UP AND CHECKOUT
Power On Checkout.
•
Once the unit is properly mounted, you may begin the checkout procedure. First,
insure that all the equipment to be powered by the unit is installed.
•
Install the provided battery fuse and fuse holder cap. The fuse holder is on the right
side panel of the SEI-250. The fuse holder is on the left side panel of the SEI-500
and SEI-750.
•
Attach the optional SNMP Network cable, or alarm contacts cable if so optioned.
•
Attach the supplied AC power cord to the left side of the DC-UPS.
•
Plug in the DC-UPS power cord into the commercial AC outlet made available for
this unit.
•
When power is first applied, the unit should display a flashing green Battery Charge
Status LED and a solid green Battery Test Status LED.
•
Connect the user equipment to the DC-UPS output connectors located on the right
side of the unit.
•
Verify that the connected equipment is receiving power.
•
If you have a specific question not addressed in this manual, please call
1-800-765-
4SEI
(
1-800-4734
), for technical support.