background image

Overcurrent Elements 

Page 6 of 7 

20120723 

Hands-On Activity 3: Validate Time-Overcurrent Element 

In this hands-on activity, you will validate the Winding 2 time-overcurrent element. 

Validate Time-Overcurrent Test Values 

The instructor will use the SEL-AMS to inject secondary quantities into the relay terminals to simulate 
faults (as indicated in Table 1). 

Step 1 

Calculate the expected operate time using the equations from Figure 5, and record your answers in 
Table 2. 

 

Figure 5  Time-Overcurrent Operation Equations 

Table 2  Simulated F1 Values for Element Pickup Test 

Element Name 

Calculated Operate Time 

at Three Times Pickup 

Test Time 

Percentage Difference 

51P1T  

 

 

51P2T  

 

 

50NN2T  

 

 

Step 2 

Clear the SER entries. 

You can perform this task by using either the 

SER C

 serial port command or the 

AC

SEL

ERATOR

 

QuickSet HMI. 

Summary of Contents for SEL-387A

Page 1: ...instantaneous or definite time elements are available for overcurrent protection breaker failure protection overcurrent phase selection for targeting transformer backup protection and so on Two levels...

Page 2: ...Element Settings Step 2 Determine the Winding 1 Max Phase Time Overcurrent Trip Level setting 51P1P ________________ The transformer maximum expected load equals MVA 1000 kV 3 Set the 51P1 pickup to...

Page 3: ...5 Verify that the Neutral Inst Overcurrent Trip Delay 50NN1D is set at minimum value of 0 50 Step 6 Select Group 1 Set 1 Winding 2 Elements Figure 3 Phase Time Overcurrent Element Settings Step 7 Det...

Page 4: ...default values 51P2RS Y 51P2TC 1 Step 11 Save your settings and then send them to the relay Hands On Activity 2 Validate Overcurrent Elements In this hands on activity you will validate the phase and...

Page 5: ...le Relay Word bit asserts Step 1 Reset relay targets by pushing the TARGET RESET pushbutton located on the relay front panel Step 2 Clear the Sequential Events Recorder SER entries You can perform thi...

Page 6: ...minals to simulate faults as indicated in Table 1 Step 1 Calculate the expected operate time using the equations from Figure 5 and record your answers in Table 2 Figure 5 Time Overcurrent Operation Eq...

Page 7: ...rt command or the ACSELERATOR QuickSet HMI Step 3 After the instructor applies the fault current use the TARn serial port command n the Relay Word bit for the element under test or the ACSELERATOR Qui...

Reviews: