Open Roll Installation Instructions
OPEN ROLL, MODELS Z-125 | Z-150
Tape Measure
Power Drill / Screwdriver
Pencil
Level
Screws
End Caps
Shade Brackets
Idler-end
Bracket
Control-end
Bracket
Roller Shade
Idler side
Control Side
Valance
If Ordered
If Ordered
*Note: Valance Returns are
optional
Bracket
STEP 1 - VALANCE INSTALLATION
(
If Ordered
)
B -
For OUTSIDE mount,
mark the location
of the
shade mounting brackets with a pencil (see step 2),
and measure 1/2” from the top of the bracket to note
the location of the Valance bracket. Valance brackets
should be installed 5”-8” from each end of the valance.
Additional bracket(s) may be necessary and should
be evenly spaced between the two ends brackets if
required.
A -
For INSIDE mount, divide valance width into
thirds and mark 2 screw holes on the underside
of the valance. Drill through cover to secure the
valance in place.
REQUIRED TOOLS FOR INSTALLATION
COMES WITH YOUR ORDER
ROLLER SHADE INSTRUCTIONS
NOTES
5”-8”
1/3
distance
1/3
distance
5”-8”
1/2”
x2
•
Valance must be installed as a first step before the Roller Shade. If you didn’t order a Valance proceed to Step 2.
Shade Brackets
Idler-end
Bracket
Clutch-end
Bracket
ChainGuard
SpringDrive | WandControl | E-Touch
1
©2022 Select Blinds
Open Roll Installation Instructions |