Installation
Installation
General Requirements
The SP PRO must only be installed by suitably qualified personnel.
Many procedures covered in the installation sections of this manual have inherent risks. Whilst the
SP PRO is designed to be safe, including safety features never before found in an inverter (such as
Earth / neutral bond monitoring), the voltages connected to, or generated within, the SP PRO are
hazardous and potentially fatal.
It is the responsibility of the installer to ensure the installation and all the wiring is carried out
according to all safety standards that are applicable to the installation. The wiring diagrams and
installation instructions are given as a guide only and compliance to appropriate standards is the
responsibility of the installer.
The following section provides general installation instructions for the SP PRO. For information on
specific configurations please refer to the installation-specific applications section in this manual and
the relevant installation guide supplied with any required installation options.
All installation notes including this manual can be downloaded from:
Environmental Considerations
Environmental Category
The SP PRO is designed with an Environmental Category (as defined by IEC 62109-1:2010) for ‘Indoor,
unconditioned’. The SP PRO must be protected by a building or enclosure from direct rain, sun, wind-blown
dust, fungus and radiation to the night sky. The SP PRO must be installed in a dry environment.
Pollution Degree 2
The SP PRO is designed to operate in a pollution degree 2 environment. Normally only non-conductive
pollution occurs with occasional temporary conduction due to condensation expected.
Temperature
The SP PRO is designed for an ambient operating temperature between -20°C and 60°C, with a storage
temperature range between -20°C and 70°C.
Air Flow
For best performance ensure nothing impedes ambient air from being drawn in the bottom of the unit and that
hot exit air is vented away and doesn’t recirculate into the unit. Particular attention must be paid when
installed inside a cabinet or enclosure.
Clearance From Other Equipment
A clearance distance of 150mm around all sides, top and bottom is recommended. Particular care must be
taken when mounting near other heat-producing equipment.
Humidity Tolerance
The SP PRO is designed to operate in a humidity range of 0–99% non-condensing.
Ingress of Particles
The SP PRO has been designed to meet IP rating 43 (protected against solid objects larger than 1.0mm /
protected against water falling as a spray at up to 60 degrees from the vertical).
Effects of Altitude on the SP PRO
The power rating of the SP PRO should be compensated for the
effects of altitude by applying the appropriate derating factor. For
example, at 2,000m above sea level the SPMC482-AU is rated at
7.5kW x 0.85 = 6.3kW at 25°C.
Altitude (m)
Derating Factor
0
1.00
1,000
0.95
1,500
0.90
2,000
0.85
General Requirements