8
Selectronic Australia
Rev 41 - Dec 2022
Installation
Preparation
The selection of a suitable site and good preparation is essential in gaining optimum performance from the
SP PRO.
The SP PRO inverter’s performance is dependent upon the environmental operating conditions, in particular
ambient temperature and ventilation. In addition, safety aspects must be considered, such as:
•
Restricting access to authorised personnel only.
•
Consideration of maintenance of ambient temperatures to ensure performance within the product’s
specifications.
•
Positioning the unit(s) away from heat-producing devices such as generators.
•
Adequate ventilation, adhering to the minimum clearances required for adequate heat dissipation.
Minimum 150mm clearance from top, bottom and sides.
Minimum 150mm between each SP PRO or SP PRO and any solar inverter or solar controllers.
•
Installing in a covered location away from direct rain. The SP PRO has an environmental rating of IP43
which makes it unsuitable for water spray that is greater than 60 degrees from the vertical or greater than
0.7 litres per minute.
•
Installing in a location shaded from direct sunlight.
•
Installing away from any explosive gas.
•
Ensuring the site is rodent proof.
•
Installing in a clean environment away from dust, iron filings, workshop pollutants and other small particles.
•
Installing within enough room to remove the cover.
•
The provision of infrastructure for monitoring, e.g. data cables
The SP PRO must be installed according to the requirements of applicable standards (such as AS/NZS
5139:2019). It is the responsibility of the system designer and integrator to identify and follow any applicable
standards.
General Requirements