11
Selectronic Australia
Rev 41 - Dec 2022
Installation
8
– Wiring must only be carried out by
suitably qualified installers and must adhere
to all relevant standards.
9
– When all the AC wiring is complete, reinstall
the terminal cover and expansion card.
Important:
a.
Failure to fill any holes in rear gland plate (
A
) or
lower gland plate (
B
) will reduce IP rating and
compromise thermal design – this will likely void
warranty.
b.
Installation of the included battery temperature
sensor in non-managed battery systems is
imperative for correct and accurate charging.
Where a managed battery is installed, the
SP PRO reads the battery temperature from the
battery’s BMS. The temperature sensor should
remain connected to the expansion card and
remain coiled up in the SP PRO.
Installing SPMC models
The rear gland plate (
A
) is screwed to the mounting bracket. This allows all wiring to be carried
out after the mounting bracket is installed and before the SP PRO is hung on the mounting
bracket.