5
www.self-electronics.com
6
www.self-electronics.com
4
Power on.
Typical Installation(without existing lights):
1
Ready for mounting.
2
Install the LED light.
3
Install LED driver and wiring.
Note: The driver should be installed in the metal enclosure of refrigerator.
The thickness of metal enclosure should be no less than 0.026"(0.66mm) in case
of steel.
The thickness of metal enclosure should be no less than 0.032"(0.81mm) in case
of copper, brass,aluminum sheet, and extruded aluminum.
The thickness of steel
for mounting should be
between 0.0157"~0.118"
(0.4mm-3mm)
C