background image

 

DT-E 11.11.1 BALCONY AWNING  ITALIA BALCONY 
Edition: March 2017, Issue 2 
English 

     

 

 

 

 

 

 

 

 

 

 

 

page 14 / 19 

17) Start the arms installation with marking the fixing spots for arm brackets on the balustrade.

 

          

 

        

         

   

                           

       

 

   

 

18) Drill holes in marked spots. 

 

 

 

19) Fix the arm to the balustrade. 

  

 

 

20) Fix the second arm in the 
same manner. 

 

 

 

       

21) Slide eyelets to the groove in the front bar.   

 

 

22) Release the arms blocade with a handwheel. 
Then attach the upper part of the arm (hook) to 
the eyelet in the front bar.  
 

 

Summary of Contents for 11.11.1 DT-E

Page 1: ...PRODUCT TECHNICAL AND OPERATIONAL DOCUMENTATION INSTALLATION MANUAL 11 Awnings 11 11 Balcony awning ITALIA BALCONY 11 11 1 Installation manual Documentation no 11 11 1 EN 11 11 1 DTE...

Page 2: ...cturer s name SELT Sp z o o Manufacturer s head office 45 449 Opole ul Wschodnia 23A Website www selt com Plant address Wydzia Produkcji Markiz 45 449 Opole ul Wschodnia 23A Contact details Tel 48 77...

Page 3: ...installation 8 3 1 General requirements for safe installation 8 3 2 Requirements for safe installation at heights 8 3 3 Preparation to installation 9 3 4 General guidelines for installation 9 3 5 Ins...

Page 4: ...Directive 2001 95 EC of the European Parliament and the Council DZ U Journal of Laws of 12 December 2003 No 229 item 2275 as amended 1 2 Notes on symbols and marks The below symbols icons denote part...

Page 5: ...ocumentation is valid jointly with the information concerning a specific product which is available on the website www selt com The documentation is a component of product delivery and should be const...

Page 6: ...tube diameter 70 mm Arms Lowered aluminum Tilt angle 0 160 Manual drive Crank 1 5 m 1 8 m 2 2 m Optional hood No Construction colour White beige brown silver structural graphite Fabric C 140 patterns...

Page 7: ...DT E 11 11 1 BALCONY AWNING ITALIA BALCONY Edition March 2017 Issue 2 English page 7 19 2 2 Italia awning construction...

Page 8: ...se it poses a high risk of danger to human health and safety and in particular fall from height Preparation of a plan on health and safety during installation is the responsibility of the Purchaser Pu...

Page 9: ...hand and fingers harm during opening and closing of the awning the awning should be installed on such height so that the lowest element of the awning after it is opened is at least 2200mm above the gr...

Page 10: ...s hammer drill drills ladder scaffolding screw driver hammer measure tape pencil marker spirit level ring flat wrenches Allen keys anchors 3 6 Italia Balcony awning installation For base uncracked con...

Page 11: ...marking installation spots for brackets Level the bracket vertically with spirit level and mark places for installation holes 3 Drill in marked places 4 Fix installation anchors 5 Install wall bracket...

Page 12: ...ket on the round pin with slide bearing a 9 Level the awning horizontally with spirit level b 10 Mark the installation spot for the second bracket Pay particular attention so that brackets are install...

Page 13: ...13 19 12 Fix installation anchors 13 Screw on the bracket 14 Set up the awning with plug and square pin on the bracket from the drive side 15 Put the awning with the round pin and slide bearing into...

Page 14: ...king the fixing spots for arm brackets on the balustrade 18 Drill holes in marked spots 19 Fix the arm to the balustrade 20 Fix the second arm in the same manner 21 Slide eyelets to the groove in the...

Page 15: ...Y AWNING ITALIA BALCONY Edition March 2017 Issue 2 English page 15 19 23 Secure the eyelets with screws 24 Fix the front bar side covers with screws 25 The eyelets can be also fix to the arm hook as s...

Page 16: ...th a handwheel After setting the tilt angle proper fabric tension is provided by slightly rolling up the excess of fabric Gears 11 1 are not equipped with overturn protection so called mechanical end...

Page 17: ...screpancies in quantity or possible replacements of parts being the evident result of Selt SP Z O O fault the company agrees to supplement or replace in the shortest possible time 4 2 General conditio...

Page 18: ...mission Regulation EC No 574 2004 of 23 February 2004 amending Annexes I and III to Regulation EC No 2150 2002 of the European Parliament and of the Council on waste statistics Regulation of the Minis...

Page 19: ...ssue 2 English page 19 19 b Marking on accompanying documents SELT Sp z o o OPOLE ul Wschodnia 23A POLAND 07 EN 13561 Balcony awning ITALIA BALCONY 500x70 For external use Wind load resistance 1 class...

Reviews: