DT-E 1.1: SUN PROTECTION SCREEN – VENETIAN BLINDS C50 Slim
Issue 2 / April 2017 / EN
page 10 / 25
4.3.
GENERAL GUIDELINES FOR INSTALLATION
mounting of the brackets and covers should be done with appropriate bolts and pins (they are not included with
the product),
in case of reinforced concrete lintel or solid bricks, dowels should be used for mounting. Make sure their size is
correctly selected for bearing capacity,
depending of the type of the wall structure appropriate mounting system should be selected,
longitudinal axis of the product head rail should be leveled, otherwise the product will not roll correctly
the product should be protected against any stains made by e.g. silicon, mortar or mounting foam, which may
cause its malfunction,
using any chemical substances containing bituminous substances or any other substances making reactions with
the product is forbidden.
Improper installation may cause hazardous situation for the user.
4.4.
INSTALLATION TOOLS
List:
drills for metal and concrete,
hummer drill,
ladder/scaffolding,
screwdriver,
hammer,
tape measure,
pencil/pen,
spirit level,
Allen wrenches,
cutter.
4.5.
INSTALLATION
Installation and operating manual and instructions for safe use is available after log in on www.selt.com.
Internal mechanisms in the head rail can move during incorrect transport of the product (in vertical
position). Therefore one should check the placement if mechanisms in the head rail before commencing
the installation.
4.5.1.
C50 SLIM INSTALLATIO N – FREE-HANGING SYSTEM
1.
Measure and mark installation spots for wall-
ceiling brackets. Pay attention to elements
which can collide with rolling down venetian
blind (e.g. handles in niche installation). Img. 1
and 2
Img. 1