DT-E 1.4: SUN PROTECTION SCREEN – VENETIAN BLINDS Z90
Issue 2 / April 2017 / EN
page 21 / 58
Img. 24
15.
Connect the installation cable and open round 30
cm of the blind to facilitate the installation of the
bundle to the cassette
.
Img. 25
16.
Install the head rail with bundle to open head rail
brackets. Close the bracket and tighten the screws.
Img. 26
17.
Install bottom guide rail end caps.
Img. 28.
18.
Check the functioning of the blind and end
positions. Correct if necessary.
Img. 27
4.5.3.
INSTALLATION OF VENE TIAN BLIND Z90 WITH CUBE AND OVAL G UIDE RAIL – GROUP
INSTALLATION
1.
Measure and mark the installation spot of the first guide rail bracket
. (Img. 1-3).