DT-E 1.4: SUN PROTECTION SCREEN – VENETIAN BLINDS Z90
Issue 2 / April 2017 / EN
page 41 / 58
16.
Install cover panel to auxiliary brackets.
17.
Check correct operation of the blind.
Img. 12
4.5.6.
Z90
B O X
WITH UNDER-PLASTER CASSETTE INSTALLATION
a)
Installation guidelines
Application of system with under-plaster cassette is advised for the installation of Venetian Blind on facades with thermal
insulation. Under-plaster cassette limits the effect of thermal bridge and provides aesthetical finishing of the façade
without reducing the light of window opening, as opposed to other guide rail systems. Scheme of the system is presented
by Fig. 10.
Fig. 9. Guide rail for under-plaster cassette – elements
Fig. 10. Venetian Blind Z90 BOX – with under-plaster cassette.