background image

 

DT-E 1.4: SUN PROTECTION SCREEN – VENETIAN BLINDS Z90                                                                                                                                                                           
Issue 2 / April 2017 / EN                                                                                                                                                                                

 

        page  6 / 58                                                                                                                                                      

 

 

 

 

 

           

 

2.

 

PRODUCT TECHNICAL IN FORMATION 

 

Product technical specification is available at 

www.selt.com

 after log in. 

2.1.

 

TECHNICAL PARAMETERS : 

Dimensions: 

Width 

Height 

Max. area 

Electric drive 

4500 mm 
3200 mm 

4500 mm 
5000mm 

 

Manual drive (max. 9m

2

4500 mm 

5000 mm 

9m

2

 

Slat 

93,4 mm 

12,9 mm 

 

Available with extruded aluminium side guides 

Manual drive 

Crank 

Made of anodized aluminium, the length equals to 2/3 system height 

Electrical drive motor of the following parameters: 

- supply voltage 

230V/50Hz 

- power 

90 to 230 W (depending on the motor type and blind size) 

- current consumption 

0,4 to 1 A (depending on the motor type and blind size) 

- protection level 

IP 44, IP 54 (depending on the motor type) 

- time of continuous work 

4 to 6 mins  (depending on the motor type) 

- torque 

6 Nm – 20 Nm (depending on blind size) 

- rotation speed 

24 or 26 rpm (depending on the motor type) 

- work temperature 

-25 to 70°C (depending on the motor type) 

Installation: 

Application 

External 

Installation place 

To the niche (installation to the wall/ceiling) or on the building facade 

 

Detailed data concerning individual motor parameters is available from manufacturer’s websites as well as on:  

www.selt.com

 →  PRODUCTS  → AUTOMATION 

 

2.2.

 

PRODUCT CHARACTERIST ICS 

 

Types of products: 

 

Installed  on  the  outside  of  the  building,  operated  by  a  electromechanical  drive  connected  with  the  operating 

system,  

 

Installed on the outside of the building, operated manually with a crank mechanism.. 

 
 

Summary of Contents for Venetian Blind Z90

Page 1: ...1 Sun protection screen Venetian Blind 1 4 Venetian Blind Z90 TECHNICAL AND OPERATIONAL DOCUMENTATION INSTALLATION AND OPERATING MANUAL AND INSTRUCTIONS FOR SAFE USE 1 4 DT E DTE DT E...

Page 2: ...Wschodnia 23A Plant address Wydzia aluzji Fasadowych i Refleksoli Fa ade and External Textile Roller Blind Department 45 449 Opole ul Wschodnia 23A Contact details Tel 48 77 553 21 00 sekretariat Fax...

Page 3: ...upporting product 15 4 5 3 Installation of venetian blind Z90 with cube and oval guide rail group installation 21 4 5 4 Concealed guide rail installation 30 4 5 5 Window frame guide rail installation...

Page 4: ...124 Linked documents Declaration of performance Declaration of conformity product with motor and manual of installation and use of motors and control 1 2 NOTES ON SYMBOLS AND MARKS The below symbols i...

Page 5: ...MATION REGARDING SAFETY WARNING FOLLOWING THE MANUAL IS ESSENTIAL FOR SAFETY OF PEOPLE KEEP THIS MANUAL The documentation is valid jointly with the information concerning a specific product which is a...

Page 6: ...on 0 4 to 1 A depending on the motor type and blind size protection level IP 44 IP 54 depending on the motor type time of continuous work 4 to 6 mins depending on the motor type torque 6 Nm 20 Nm depe...

Page 7: ...connected with work of mechanical parts caused by electric drive during its work is not said to be a significant danger and it is a way of comfort the level of acoustic pressure is up to 58dB the moto...

Page 8: ...NS OF PRODUCT TRNAPORT AND STORAGE List The product is factory packed in a cardboard box to prevent its damage during storage transport and during its transportation to the place of final assembly For...

Page 9: ...nt for the drive operation should be immobilized 4 1 REQUIREMENTS FOR SAFE INSTALLATION AT HEIGHTS Installation of the product because it requires performing work at heights is particularly dangerous...

Page 10: ...ces making reactions with the product is forbidden Improper installation may cause hazardous situation for the user 4 4 INSTALLATION TOOLS List drills for metal and concrete hummer drill ladder scaffo...

Page 11: ...sue 2 April 2017 EN page 11 58 Img 1 Rys 2 1 Put silencing cap on the auxiliary bracket Standard head rail bracket Elastic head rail bracket 2 Connect head rail bracket with main bracket Fit the compl...

Page 12: ...stalled cover panels and brackets correct if necessary Appropriate leveling of the product is necessary for its correct functioning Img 4 6 Loosen the screw of elastic bracket so that it is easy to op...

Page 13: ...modular installation Single and double guide rail bracket types Type 1 standard Type 2 Type 3 Type 4 Type 4 installation manner Loosen the cone shaped screw so that the bracket is easy to click into...

Page 14: ...NDS Z90 Issue 2 April 2017 EN page 14 58 11 Slide brackets to guide rails Install brackets to guide rails by fixing the screw Img 9 Img 10 12 Slide the guide rail on the slat pins Img 11 13 Set the ve...

Page 15: ...guide rail axis then secure the bracket Img 14 Img 15 16 Install guide rail end caps 1 set screw After the installation is finished set the end positions and check the correct functioning of the blind...

Page 16: ...ing should be performed with a wrench 10 and maximum 4 full turns 1440 NOTE bigger turn will result in tearing out the threaded stud 1 Measure and mark the spots for guide rail brackets installation I...

Page 17: ...DT E 1 4 SUN PROTECTION SCREEN VENETIAN BLINDS Z90 Issue 2 April 2017 EN page 17 58 Img 3 Img 4 Img 5 Img 6 Img 7 Img 8 3 Loosen cone shaped screws securing the bolts Img 9...

Page 18: ...17 EN page 18 58 4 Pull the bolt out Img 10 5 Slide the guide rails on brackets and secure the cone shaped screw Img 11 12 and 13 Img 11 Img 12 Img 13 6 Check the vertical level of the guide rail Img...

Page 19: ...to flat bars placed in the cassette brackets should be placed in the axis of the cassette Img 16 10 Loosen the installation flat bar on the cassette side Img 17 11 Connect the cassette with guide rail...

Page 20: ...It is necessary for correct functioning of the product Img 21 13 Install top end caps in the guide rails Img 22 14 Put the head rail with bundle into the guide rails so that the label strona od okna...

Page 21: ...Img 25 16 Install the head rail with bundle to open head rail brackets Close the bracket and tighten the screws Img 26 17 Install bottom guide rail end caps Img 28 18 Check the functioning of the bli...

Page 22: ...SCREEN VENETIAN BLINDS Z90 Issue 2 April 2017 EN page 22 58 Img 1 Img 2 Img 3 2 Install the bracket to facade with appropriate fixing system Img 4 3 Measure and mark the installation spot of the secon...

Page 23: ...ssue 2 April 2017 EN page 23 58 Img 6 4 Install the second bracket Img 7 5 Measure and mark the installation spot of the next bracket img 8 install the bracket img 7 Img 8 6 Check the vertical level o...

Page 24: ...sure and mark the installation place of the second guide rail Img 10 11 Img 10 Img 11 8 Install the next bracket img 12 9 Measurement and marking for the following brackets should be done similarly to...

Page 25: ...ical level of installed brackets Img 14 12 Loosen cone shaped screws securing the bolts and pull the bolts out Img 15 Img 16 13 Slide the guide rails on bracket bolts img 17 settle the guide rail img...

Page 26: ...7 EN page 26 58 Img 18 Img 19 14 Check the level of installed guide rails Img 20 15 Loosen the installation flat bar in the cassette so that it can be slide on the guide rails Img 21 16 Install to the...

Page 27: ...N SCREEN VENETIAN BLINDS Z90 Issue 2 April 2017 EN page 27 58 17 Put the cassette on guide rails Img 23 18 Check the vertical and horizontal level of the cassette Img 24 25 Img 24 Img 25 19 Tighten th...

Page 28: ...Install the middle guide rail Img 27 21 Insert the head rail with bundle to the guides Img 28 and 29 Img 28 22 Put the head rail with bundle into the open brackets so that the label strona od okna fa...

Page 29: ...2 April 2017 EN page 29 58 24 Install consecutive bundles to brackets Img 31 25 Slide the cover profile to external guides Img 32 and cut the excess Img 33 Img 32 Img 33 26 Put the guide rails end cap...

Page 30: ...ng of the blind and set end positions according to the motor manual 4 5 4 CONCEALED GUIDE RAIL INSTALLATION a Guidelines for installation Application of concealed side guides is especially recommended...

Page 31: ...to the blind In case of the base not being stable enough it is necessary to provide supporting substructure that will provide stability and correct profile alignment Profiles must be mounted parallel...

Page 32: ...INDS Z90 Issue 2 April 2017 EN page 32 58 Fig 2 Installation of mounting profile in window niche Fig 3 Positioning of the mounting profile in window niche 1 Mounting profile 2 Concealed guide rail 3 G...

Page 33: ...res determining of how the blinds are divided The division line is located in axis of the double side guide Blinds are shown in Fig 3b and 3c For each blind group of blinds it is necessary to take min...

Page 34: ...unting profile and fastening them with tapping self drilling screws you must remove gaskets from the side guide and protect them against damage Then reinstall them b Installation 1 Fix head rail brack...

Page 35: ...ll in the upper part of mounting profile using tapping or self drilling screw as shown in Fig 4 The head of the screw should not block pins in the slats Follow the step for both guide rails Attention...

Page 36: ...the guide rail in the mounting profile pre drill holes for tapping screws to fasten guide rail Then insert the gaskets into that section The gaskets will be longer than the guide rail longer with leng...

Page 37: ...s Guidelines for window frame guide rail installation Length of the guide rail profile equals height of the system 50 mm Fig 6a shows window frame installation Fig 6b shows niche installation Installa...

Page 38: ...height and secure tightly Img 1 b Installation 1 Connect head rail bracket to the main bracket Measure to the cover panel adjust and secure tightly Img 1 NOTE For installation on window frame in the r...

Page 39: ...tall window frame guide rail to window or window niche Img 6 9 Slide head rail with bundle into guide rails so that the label strona od okna faces the window Incorrect installation of the bundle will...

Page 40: ...d fig 8 profile should be aligned with the upper Edge of guide rail Img 9 NOTE Pay particular attention so that during guiding profile installation it is not damaged by pins Fig 8 14 Place profile on...

Page 41: ...of system with under plaster cassette is advised for the installation of Venetian Blind on facades with thermal insulation Under plaster cassette limits the effect of thermal bridge and provides aesth...

Page 42: ...tallation Fig 12b shows niche installation Installation of the guide rail must be fixed to the base as well as it should be linear and perpendicular to Venetian Blind Guide rail profiles must be insta...

Page 43: ...ed to use washers with bigger outer diameter for the installation of the under plaster cassette to avoid deformations of the cassette Under plaster cassette is delivered without hole for feeder cable...

Page 44: ...ssette variable dimension usually 30 mm Fig 14 Scheme of preparation of the installation holes in the guide rail profiles b Installation 1 Measure and mark places for installation holes for the under...

Page 45: ...g holes is a service subject to additional costs Img 2 7 Install guide rail to the under plaster cassette and fasten it to the base or subconstruction Fig 17 8 Loosen screws of elastic brackets so tha...

Page 46: ...guide rail 11 Install head rail with closed bundle in bracket and secure the previously loosened screws Img 4 12 Place guiding profile inside the guide rail according to Img 5 and Fig 18 Img 5 NOTE P...

Page 47: ...ssette Fig 19 15 Connect feeder cable to the Venetian Blind and check the correctness of system functioning and setting end positions Correct if necessary NOTE Connection of the feeder cable should be...

Page 48: ...aunas rooms for domestic animals operating theatres in hospitals pump rooms heat exchange rooms spaces limited by conducing areas campsites open spaces etc are regarded as environments with increased...

Page 49: ...y the thermal protection appropriate time should pass before turning on again depending on the type of engine and atmospheric conditions about 16 minutes 4 6 3 MANUAL DRIVE Opening closing and setting...

Page 50: ...to read them It is forbidden to introduce modification in the electrical design or in the equipment configuration without consulting the manufacturer or an authorised representative Before the product...

Page 51: ...nal documentation No sharp objects or protruding elements which can hook the bottom bar or slats can be kept near the system it is forbidden to use faulty or incomplete product e g without a switch ti...

Page 52: ...handing it over to operation post assembly check in another place b make sure that the product exposed to conditions causing degradation of its technical condition which may bring about dangerous situ...

Page 53: ...the Buyer to carry out activities connected with routine use cleanness and maintenance of the product Being familiar with this documentation guarantees fault free operation of the product List of acti...

Page 54: ...conditions proximity of thoroughfare construction works carried nearby and environmental pollution It is recommended to clean slight dirt of metal aluminum surfaces with the use of water with delicate...

Page 55: ...ation cleaning and lubrication Electrical devices delivered to the Supplier in a manner not allowing for operation check e g cut off motor cable receiver in parts Damages resulting from incorrect inst...

Page 56: ...tailed description of the defect the name of the company which assembled the product and the date of finding out the defect Product with no invoice number order or contract number will be considered a...

Page 57: ...effect on the environment and human health No Subject European legal basis Polish legal basis 1 Waste electrical and electronic equipment Directive 2012 19 EU of the European Parliament and of the Co...

Page 58: ...A 2006 42 EC a Marking on the accompanying documents SELT Sp z o o Opole ul Wschodnia 23A POLAND 12 EN 13659 Venetian Blinds Z90H 450x200 Venetian Blinds Z90H 180x500 For external use Wind load resist...

Reviews: