Alyseo 106
SELTA S.p.A
.
All rights reserved. No parts of this document can be reproduced, memorized into archive system or transmitted
in any shape or through any means without the previous authorization of SELTA S.p.A.
Start-up
3-1
Alyseo 106 User Manual
720041008-A0-GB Issue 4
3. START-UP
3.1 CHECK OF MATERIAL
1. Check the integrity of the package and that all the described elements are contained.
3.2 INSTALLATION AND POWER SUPPLY
1. Verify that the room complies with what described in Climatic-environmental characteristics.
2. Check that the main power supply is 220-240 Veff (+6/-10% of tolerance, 50Hz).
3. Connect the output of the AC/DC converter to the proper ‘power jack’ on the rear panel. If
necessary, set the provided anti-tearing band.
4. Connect the AC/DC converter to the 220VAC mains outlets.
5. Connect the network cable to RJ11 connector marked by LINE (SHDSL) silk-screen.
6. Verify that the green led, marked by Ready on the front panel, is fixed on.
Summary of Contents for Alyseo 106
Page 1: ...User Manual Alyseo 106 ...