START-UP PROCEDURE
Pre-start-up procedure
(see fig. 1, page 19)
•
Familiarize yourself with all controls and button locations.
•
Ensure that all guards and covers are in place.
•
Ensure the area is clean.
•
Check input conveyor for debris, discarded tools, etc.
Start-up
Plug power cable into installed receptacle. Turn key switch on. Depress
momentarily the Forward pushbutton. Cutters will begin to rotate, conveyor
will begin to run forward and crusher blades will rotate.
For machines equipped with optional automatic cutter lube system, depress
Lube pushbutton momentarily and allow machine to run for approximately
four minutes without feeding material to be shredded. This allows time for
cutter lubrication to be accomplished without soaking the material to be
shredded unnecessarily.
To stop machine at any time depress the red Stop pushbutton. For
emergency situations the Stop pushbutton may be depressed at any time.
For normal stop situations, wait for input conveyor to empty itself and the
output chute (or optional output conveyor) to discharge all shredded material
before depressing Stop button.
Begin feeding material to be shredded. It is recommended that during the
familiarizing period the operator should proceed with small amounts of paper.
After several hours experience the operator may wish to increase the amount
of material being fed. The operator will soon be able to judge the efficiency
of the operation and feed material accordingly. It is nearly inevitable that
during this learning process the machine will jam. A jam condition will
automatically turn off the machine just as if the operator had depressed the
Stop button. This is normal.
10
Summary of Contents for 800-1000 Series
Page 19: ...Figure 1 SHREDDER OPERATION 19 ...
Page 20: ...Figure 2 CHAIN LUBRICATION 20 ...
Page 21: ...Figure 3 REDUCER LUBRICATION PN TA5215H40 21 ...
Page 22: ...Figure 4 CONVEYOR BELT TAKE UP 22 ...
Page 23: ...Figure 5 CHAIN SAG 23 ...
Page 25: ...Figure 7 DRIVE BELT ADJUSTMENT 25 ...
Page 35: ......