ATTACHED OUTPUT CONVEYOR (OPTIONAL)
INSTALLATION
o
With the assistance of an overhead crane, a 2
nd
person, a fork lift,
or any means available, rig a sling (just off center of conveyor so
that flanged side is lower.) Lift conveyor assembly into place using
the (6) bolts supplied at rear of machine. Attach conveyor and
tighten bolts.
NOTE:
Be sure that side frames of conveyor are aligned with side
frames of shredder.
o
Install conveyor belt around drive pulley (under cutter head) and
pull belt together. A second person may be necessary to bring both
ends together. When both ends are put together, take extra care
to ensure that staples are centered with belt. The edges of the belt
should be aligned, if NOT, move belt ends over one staple and re-
check alignment. When aligned properly, put connecting pin
(supplied) through staple lacing. Clip off any excess pin which may
be hanging out.
o
Snug up take-up adjustment one half turn each side until
approximately 2-inches of sag is present. Test run belt and track
belt by tightening the side that rubs until centered.
6
Summary of Contents for 800-1000 Series
Page 19: ...Figure 1 SHREDDER OPERATION 19 ...
Page 20: ...Figure 2 CHAIN LUBRICATION 20 ...
Page 21: ...Figure 3 REDUCER LUBRICATION PN TA5215H40 21 ...
Page 22: ...Figure 4 CONVEYOR BELT TAKE UP 22 ...
Page 23: ...Figure 5 CHAIN SAG 23 ...
Page 25: ...Figure 7 DRIVE BELT ADJUSTMENT 25 ...
Page 35: ......