ELECTRICAL INSTALLATION
All electrical installation and service must be accomplished by a qualified
electrician. Follow all national and local electrical codes and ordinances.
“WARNING”
LOCK POWER IN OFF POSITIION
All internal wiring has been factory installed and tested prior to shipping.
Electrical installation consists of providing adequate machine power only.
Check building service to ensure correct voltage is available and that current
requirements can be met.
Install receptacle (provided) to properly protect building circuit. Select
appropriate wire size and current protection to accommodate current
requirements as shown on nameplate. Plug in power cable.
Clear all personnel from machine area. Ensure machine is clean and no
tools, rags, or debris have been left on conveyor belt or near cutters or drive
mechanism.
Turn building service drop power on. Check voltage at installed receptacle.
Ensure area is clear. Turn key switch on. Jog reverse. Check for proper
motor rotation. If rotation is wrong, unplug power cable. Check that power
is off with voltage meter at panel. Remove any two power wires from the
motor starter, reverse and reconnect.
Clear area, turn on power and recheck rotation.
Electrical installation is complete. Lock out your building disconnect.
Replace all guards.
7
Summary of Contents for 800-1000 Series
Page 19: ...Figure 1 SHREDDER OPERATION 19 ...
Page 20: ...Figure 2 CHAIN LUBRICATION 20 ...
Page 21: ...Figure 3 REDUCER LUBRICATION PN TA5215H40 21 ...
Page 22: ...Figure 4 CONVEYOR BELT TAKE UP 22 ...
Page 23: ...Figure 5 CHAIN SAG 23 ...
Page 25: ...Figure 7 DRIVE BELT ADJUSTMENT 25 ...
Page 35: ......