7.2 Determine connection variant
7.2.1 Connection via certified inverter
For this connection variant, you only fit a power flow direction sensor (power flow direction sensor 1, yellow
network cable) directly behind the electricity supply company’s meter (seen from the mains) into the house
wiring. The SENEC.Home Li can communicate with the certified inverter. They communicate the current PV
output. A second power flow direction sensor can be omitted for this reason. All the necessary data is sup-
plied to the SENEC.Home Li by power flow direction sensor 1 and the PV inverter(s).
Grid
Generator
Consumer
OK
ESC
Passiv
Laden
Entladen
Störung
37 36 35
ABB
M14
Drehstromz
ä
hler
1376
T1 T2
T4
T3
KD
PD
T4
D
Ü
FF SET
2014
Made in EU
Type MT174-D1A52-V22-M3K03Z
3x230/400 V 0,25-5(85) A
Schltg.: IS16050
0.9.1
0.9.2
x.7.0
1.8.0
1.8.x
2.8.0
2.8.x
F.F.0
Uhrzeit
Datum
Aktuelle Wirkleistung (kW)
Gesamt-Wirkenergie A+ (kWh)
Wirkenergie A+ Tarif x (kWh)
Gesamt-Wirkener A- (kWh)
Wirkenergie A- Tarif x (kWh)
Fataler Fehler
SI 12-11-007 MID
-40
°C bis +70 °C
20.15
14.03
50 Hz
RLw=1000 Imp./kWh
Eigentum des Messstellenbetreibers
1 ISK00 6393 8492
27.743.806
Nr. 63 938 492
51 7351
14
40
ER
L
1
L
2
L
3
kW
M14
Drehstromz
ä
hler
1376
T1 T2
T4
T3
KD
PD
T4
D
Ü
FF SET
2014
Made in EU
Type MT174-D1A52-V22-M3K03Z
3x230/400 V 0,25-5(85) A
Schltg.: IS16050
0.9.1
0.9.2
x.7.0
1.8.0
1.8.x
2.8.0
2.8.x
F.F.0
Uhrzeit
Datum
Aktuelle Wirkleistung (kW)
Gesamt-Wirkenergie A+ (kWh)
Wirkenergie A+ Tarif x (kWh)
Gesamt-Wirkener A- (kWh)
Wirkenergie A- Tarif x (kWh)
Fataler Fehler
SI 12-11-007 MID
-40
°C bis +70 °C
20.15
14.03
50 Hz
R
Lw
=1000 Imp./kWh
Eigentum des Messstellenbetreibers
1 ISK00 6393 8492
27.7
43.806
Nr. 63 938 492
51 7351
14
40
ER
L1 L2 L3
kW
1
2
3
4
5
6
7
Figure 8 Connection variant 1 with certified PV inverter
1
Meter operator's up-and-down meter
6
All the consumers in the house
2
Power flow direction sensor 1
7
SENEC.Home Li storage unit
3
PV installation generation meter
Main lines
4
Certified PV inverter
Communication
5
House wiring
Note!
Output throttling in connection variants 2 and 3.
The SENEC.Home Li cannot communicate with the PV inverter in the case
of connection variants 2 and 3. It is only possible to configure output
throttling on the inverter itself. Use the manufacturer‘s declaration
issued by the PV inverter manufacturer to demonstrate effective
output
throttling.