Perfect for run-and-gun shooting, small productions, music videos and weddings, the One Minute Long Crane is 
light to carry and easy to assemble. The system utilizes light weight material, bringing the total weight of the 
unit to 25kg while extending in lengths from 3.2m to 5,6m (see the photo below).  
Easy setup and breakdown makes transportation and change of location effortless. The high quality design 
utilizes axial bearings built in all joints which allow firm and stable movement for elegant and smooth shooting.  

 
Features: 

 

Material: Aluminum 

 

Weight: 25 kg 

 

22 axial bearings for extra smoothness  

 

Setup: 5 minutes  

 

Max height of Jib:  5.6 m 

 

Stability: Side and top support strings 

 

Mounting Hardware: 3/8” and ¼” mounting 

 

Possible longitudes of One Minute Long Crane 

Summary of Contents for One Minute Long Crane

Page 1: ...One Minute Long Crane User Manual...

Page 2: ...to 5 6m see the photo below Easy setup and breakdown makes transportation and change of location effortless The high quality design utilizes axial bearings built in all joints which allow firm and sta...

Page 3: ...der for mounting the head Dolly frame String holders Apapter for 3 2 m version Dolly tripod clip Weights holding rod Crane arm fastener Auxiliary tripod for easier assembly Magic Arm monitor holder Ve...

Page 4: ...d screw Unfold the legs of the tripod and put them into corresponding slots in the dolly NOTE IN ORDER TO BE FIRM AND STABLE ONE MINUTE LONG CRANE MUST ALWAYS BE MOUNTED ON DOLLY FRAME Dolly frame als...

Page 5: ...arm fastener as described in the picture While doing that hold the upper end with the other hand so that it does not move dolly tripod clip Fasten the dolly to the tripod using the enclosed dolly tri...

Page 6: ...To mount One Minute XL crane mount the LAST extension to the first extension the sequence of numbers on the crane arm should be 1 2 3 LAST Use the auxiliary tripod to hold the crane arm while you are...

Page 7: ...nt the LAST extension to the second extension the sequence of numbers on the crane arm should be 1 2 3 4 5 LAST One Minute Long Crane 5 6m Add the strings as shown in the charter 2 1 Mounting the stri...

Page 8: ...m version uses 3 springs 1 top and 2 side strings One Minute Long Crane 5 6m version uses 3 springs 1 top and 2 side strings 3 string extensions one per string 2 1 1 Attaching the strings To attach th...

Page 9: ...e crane use the enclosed screw Both screws come attached onto the front side of the crane arm See the picture on the left For the Remote Head controller there is a head control plate holder enclosed t...

Page 10: ...5 Pan and tilt breaks Pan and tilt movements of the crane can be fixed with pan and tilt breaks See the picture below...

Reviews: