Putting the receiver into operation
19
Connecting the mains unit
Only use the supplied NT 2-3 mains unit. It is designed for your receiver
and ensures safe operation.
To connect the NT 2-3 mains unit:
왘
Connect the yellow connector of the mains unit
to the yellow
socket
at the rear of the receiver.
왘
Pass the cable of the mains unit through the cable grip
.
왘
Slide the supplied country adapter
onto the mains unit
.
왘
Plug the mains unit
The
STANDBY
button
is backlit in red.
!
542.625
SKM500
ew500 G3
B.Ch: 20.30
PEAK
EQ
+ 12dB
P
-10
0
40
30
20
10
-20
-30
-40
AF
RF
MHz
P
Summary of Contents for EM 500
Page 1: ......