Appendix B: GPR Emissions, Interference and Regulations
75
Federal Communications Commission
445 12
th
Street, SW, Washington, D.C.
20554
Attn: UWB Coordination
(
Sensors & Software Inc. Note
: The form given on the following page is a suggested format for
performing the coordination.)
(c) The manufacturers, or their authorized sales agents, must inform purchasers and users of
their systems of the requirement to undertake detailed coordination of operational areas with the
FCC prior to the equipment being operated.
(d) Users of authorized, coordinated UWB systems may transfer them to other qualified users
and to different locations upon coordination of change of ownership or location to the FCC and
coordination with existing authorized operations.
(e) The FCC/NTIA coordination report shall identify those geographical areas within which the
operation of an imaging system requires additional coordination or within which the operation of
an imaging system is prohibited. If additional coordination is required for operation within
specific geographical areas, a local coordination contact will be provided. Except for operation
within these designated areas, once the information requested on the UWB imaging system is
submitted to the FCC no additional coordination with the FCC is required provided the reported
areas of operation do not change. If the area of operation changes, updated information shall be
submitted to the FCC following the procedure in paragraph (b) of this section.
(f) The coordination of routine UWB operations shall not take longer than 15 business days
from the receipt of the coordination request by NTIA. Special temporary operations may be
handled with an expedited turn-around time when circumstances warrant. The operation of
UWB systems in emergency situations involving the safety of life or property may occur without
coordination provided a notification procedure, similar to that contained in Sec. 2.405(a) through
(e) of this chapter, is followed by the UWB equipment user.[67 FR 34856, May 16, 2002, as
amended at 68 FR 19751, Apr. 22, 2003]
Effective Date Note: At 68 FR 19751, Apr. 22, 2003, Sec. 15.525 was amended by revising
[[Page 925]] paragraphs (b) and (e). This amendment contains information collection and
recordkeeping requirements and will not become effective until approval has been given by the
Office of Management and Budget.
Summary of Contents for LMX100
Page 1: ...2016 00048 05 ...
Page 2: ...ii ...
Page 4: ...Product Registration iv ...
Page 10: ...x ...
Page 14: ...Overview 2 ...
Page 40: ...Tools 28 ...
Page 44: ...GPR Concepts 32 ...
Page 58: ...Data Collection 46 ...
Page 63: ...Screenshots Mini Reports 51 Figure 7 6 Example of a Mini Report ...
Page 64: ...Screenshots Mini Reports 52 ...
Page 68: ...Transferring Data to a PC 56 ...
Page 72: ...Troubleshooting 60 ...
Page 75: ...Care Maintenance 63 ...
Page 76: ...Care Maintenance 64 ...
Page 78: ...Parts List Accessories 66 ...
Page 80: ...Parts List Accessories 68 ...
Page 82: ...Technical Specifications 70 ...
Page 84: ...Appendix A Health Safety Certification 72 ...
Page 92: ...Appendix B GPR Emissions Interference and Regulations 80 ...
Page 94: ...Appendix C Instrument Interference 82 ...
Page 96: ...Appendix D Safety around Explosive Devices 84 ...