Dear User
• Carefully read the operating instructions before
using the control . By doing so you will utilize all
the benefits of the device and you will prevent da
-
mages.
• To protect yourself, turn to your supplier should
particular problems occur, which are not sufficiently
dealt with in these assembling instructions.
• Unauthorized changes or modifications of the control
are not permitted due to safety reasons.
• We reserve the right to make technical changes.
Meaning of characters in the operating instruc-
tions:
WARNING:
if not observed you may be subject to severe or
even deadly injury.
CAUTION:
if not observed you may be subject to medium to
light injuries or materials may be damaged.
NOTE:
gives advice concerning applications and useful
information.
Fire hazard
Keep these assembling and operating instructions
near the control for quick and easy reference re-
garding important information for safety and ope-
ration.
General Safety Information
Follow the special safety information of each chap-
ter.
As directed use:
• Prior to turning on the sauna control and to setting
the desired time (time until the stove starts) make
sure that no combustible objects have been placed
on top of the stove.
• The control K2-NEXT is used to control the functions
in accordance with the technical data.
• Do not place any objects on top of the stove.
• You are only allowed to use the control K2-NEXT
for controlling 3 heating circuits with a maximum
heating capacity of 3.0 kW per heating circuit.
• This device is not designed to be used by persons
(including children) with reduced psychological,
sensory or mental abilities or lack of experience
and/or lack of knowledge, unless they are being
supervised by a person responsible for their safety
or have received from the latter instructions on the
appropriate use of the device.
• Children should be supervised, in order to ensure
that they do not play with the device.
Disposal:
• Old used devices contain recyclable materials.
Therefore please do not simply dispose of them
at the nearest landfill, but do inquire at the admi
-
nistrative offices of your city or district about the
possibility of recycling.
Pausing operation for a longer time period
When pausing operation for a longer time period, shut
off the main fuses of the control in the fuse box.
WE DO IT FIRST.
Instructions for use for the user
P. 6/14
Summary of Contents for K2-NEXT
Page 13: ...4 3 2 1 5 6 Abbildung 4 Abbildung 3 Montage und Gebrauchsanweisung S 13 14 WE DO IT FIRST DE ...
Page 27: ...4 3 2 1 5 6 Figure 4 Figure 3 WE DO IT FIRST EN Instructions for installation and use P 13 14 ...
Page 40: ...4 3 2 1 5 6 Figure 4 Figure 3 Instructions de montage et mode d emploi p 12 12 WE DO IT FIRST ...
Page 52: ...4 3 2 1 5 6 Figura 4 Figura 3 Istruzioni per uso e montaggio P 12 12 WE DO IT FIRST ...
Page 64: ...4 3 2 1 5 6 Afbeelding 4 Afbeelding 3 Montage en gebruiksaanwijzing Pag 12 12 WE DO IT FIRST ...
Page 77: ...4 3 2 1 5 6 Bild 4 Bild 3 Monterings och bruksanvisning S 13 13 WE DO IT FIRST SV S 13 72 ...
Page 78: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES WE DO IT FIRST ...
Page 91: ...4 3 2 1 5 6 Obrázek 4 Obrázek 3 WE DO IT FIRST CS Návod k montáži a použití s 13 12 s 13 72 ...