Technical Data
Dimensions: L x W x H: 238 x 195 x 73,50 mm
Environmental conditions:
Storage temperature:
-25°C to + 70°C
Ambient temperature:
-10°C to + 40°C
Air humidity:
max. 95 %
Minimum temperature stability of the connecting
lines:
Heating system, lighting circuits, and stove lines are
heat-resistant to at least 150°C .
Maximum length of lines:
stove
sensor:
3
m
Control:
Switching voltage / three-phase 3N:
400 V
Frequency:
50
Hz
Switching capacity / heating AC 1:
3 x 3 kW
Switched current each phase /
heating
AC
1:
13
A
Nominal voltage:
230 V
Min. / max. pick-up capacity:
4,3 / 6,3 VA
Degree of protection (splash-proof):
IP X4
Connection to the main circuit as permanent wiring
(non-detachable connection).
Light:
AC1 switched current:
1A
Switching capacity:
max. 230W
Edition: 07-2012
Ident-No. K2-9-B
Thermal safety:
Stove sensor with overtemperature protector,
shutdown temperature 139°C.
Automatic shutdown after, at the maximum of 6 hours
(depending on the factory setting).
Optional sauna door safety-monitor when the desired
time has been set:
• Without heating operation:
- The desired time set will be cancelled on opening
of the sauna door.
• With heating operation at temperatures below
40°C:
- The heating will be shut down.
- Restarting the control is necessary.
• With heating operation at temperatures above
40°C:
- The heating will shut down, if the sauna door remains
opened for more than 5 seconds.
- Heating continues on closing the sauna door.
Range of adjustment:
Temperature:
40-125 degrees Celsius
above
the
stove.
Selected start-time:
in 15 minute increments
Min. of selected start-time.
15 minutes
Max.of selected start-time:
23 hours 45 min.
Duration of heating:
Automatic shutdown after
6
hours*.
* If used in apartment buildings, hotels, or similar buil-
dings, the operational timeframe has to be limited to
12 hours.
WE DO IT FIRST.
EN
Instructions for installation and use
P. 11/14
Summary of Contents for K2-NEXT
Page 13: ...4 3 2 1 5 6 Abbildung 4 Abbildung 3 Montage und Gebrauchsanweisung S 13 14 WE DO IT FIRST DE ...
Page 27: ...4 3 2 1 5 6 Figure 4 Figure 3 WE DO IT FIRST EN Instructions for installation and use P 13 14 ...
Page 40: ...4 3 2 1 5 6 Figure 4 Figure 3 Instructions de montage et mode d emploi p 12 12 WE DO IT FIRST ...
Page 52: ...4 3 2 1 5 6 Figura 4 Figura 3 Istruzioni per uso e montaggio P 12 12 WE DO IT FIRST ...
Page 64: ...4 3 2 1 5 6 Afbeelding 4 Afbeelding 3 Montage en gebruiksaanwijzing Pag 12 12 WE DO IT FIRST ...
Page 77: ...4 3 2 1 5 6 Bild 4 Bild 3 Monterings och bruksanvisning S 13 13 WE DO IT FIRST SV S 13 72 ...
Page 78: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES WE DO IT FIRST ...
Page 91: ...4 3 2 1 5 6 Obrázek 4 Obrázek 3 WE DO IT FIRST CS Návod k montáži a použití s 13 12 s 13 72 ...