l
F.8L Falco Construction Manual
17–9
Revision 4, March 1, 2002
❏
As stated above, ream the upper 3/16ӯ bolt hole through P/N 750 and install the bolt.
See Figure 10.
Figure 11
❏
As stated above, drill the lower hole through P/N 750 with a 5/32ӯ drill, ream up to
3/16ӯ and install the bolt. See Figure 11.
As you can see from Drawing No. 402, Section B-B, the bottom of the slot of the fin spar must be
sanded for clearance with the elevator balance weight arms. At the top of the slot, the upper
center fuselage longeron must also be sanded to provide clearance with P/N 750. You may have
to carve small recesses into the aft face of the main fin spar to provide clearance for the bolts
fastening the elevator balance weight arms to P/N 750. You should also be aware that one or two
metal plates, and P/N 857-8 are installed as elevator stops. See Drawing No. 857 for alternative
construction of P/N 857-8.
Summary of Contents for F.8L Falco
Page 1: ...F 8L Falco Construction Manual...
Page 7: ...l F 8L Falco Construction Manual Revision 4 March 1 2002...
Page 21: ...l F 8L Falco Construction Manual 1 8 Revision 4 March 1 2002...
Page 29: ...l F 8L Falco Construction Manual 2 8 Revision 4 March 1 2002...
Page 43: ...l F 8L Falco Construction Manual 5 4 Revision 4 March 1 2002...
Page 65: ...l F 8L Falco Construction Manual 9 6 Revision 4 March 1 2002...
Page 81: ...l F 8L Falco Construction Manual 10 16 Revision 4 March 1 2002...
Page 109: ...l F 8L Falco Construction Manual 15 4 Revision 4 March 1 2002...
Page 133: ...l F 8L Falco Construction Manual 17 10 Revision 4 March 1 2002...
Page 145: ...l F 8L Falco Construction Manual 18 12 Revision 4 March 1 2002...
Page 173: ...l F 8L Falco Construction Manual 21 10 Revision 4 March 1 2002...
Page 229: ...l F 8L Falco Construction Manual 23 40 Revision 4 March 1 2002...
Page 387: ...l F 8L Falco Construction Manual 28 26 Revision 4 March 1 2002...
Page 393: ...l F 8L Falco Construction Manual A 6 Revision 4 March 1 2002...