7.2.2 CVD2 - options
“Standby installation”
with connected pressure side (1 common pulsation damper)
Fig. 20 „Standby installation“
“2x100% installation”
with separate pressure side (2 separate pulsation dampers)
Fig. 21 „2x100%-installation“
150
Connecting conduit on the pressure side
(between pump 1 and pump 2)
200
Diaphragm pulsation damper
300
Piping on the suction side
(with dirt trap and ball valve, 1x per pump)
310
Dirt trap
320
2/2 way ball cock
350
Connecting conduit on the suction side
(between pump 1 and pump 2)
400
Piping overflow valve back into the suction pipe
(only in connection with piping on the suction side, 1x per
pump)
600
Terminal box
610
Main switch of pump
650
Socket
(1x per pump)
700
Leakage sensor solenoid float switch
710
Leakage sensor conductive plate electrode
800
Stand for floor mounting
(steel (galvanized) or GFK)
200
Diaphragm pulsation damper
300
Piping on the suction side
(with dirt trap and ball valve, 1x per pump)
310
Dirt trap
320
2/2 way ball cock
350
Connecting conduit on the suction side
(between pump 1 and pump 2)
400
Piping overflow valve back into the suction pipe
(only in connection with piping on the suction side, 1x per
pump)
450
Multifunction device
600
Terminal box
610
Main switch of pump
650
Socket
(1x per pump)
700
Leakage sensor solenoid float switch
710
Leakage sensor conductive plate electrode
800
Stand for floor mounting
(steel (galvanized) or GFK)