INSTALLATION OF THE OPERATOR 

 

BEFORE STARTING

 

 

 

 

 

•  Verify that the gate is equipped with a strong and solid support guide. 
•  Verify that the rail is securely anchored to the ground. 
•  Install 2 robust leaf mechanic stops and fix them strongly at the 2 ends of the rail. 
•  Verify that the leaf can move smoothly along the rail. 

 

 

ATTENTION!

 

The installation of the mechanical opening and closing leaf stops is necessary to guarantee the 
safety of the installation and of its users. The installation of the mechanical leaf stops is obligatory 
before installing the operator. 

 

 

INSTALLING THE BASE PLATE

 

 

 

• Screw one nut onto each of the 2 J-bolt, until it is 

positioned 35mm from the end. 

•  Fit the J-bolts through the holes in the base plate. 
•  Screw another nut onto each J-bolt without tightening. 
 

 

• Dig a hole, and place the base plate (fastened to the J-

bolts) inside it, along with the cable carrier hose. 

• Place the base plate respecting the specified positioning 

quotes and fasten it keeping it in a flat position. 

 

 

•  Cast concrete to secure the unit to the ground, ensuring all 

the base plate parts are kept clean, and the 2 nuts are 
completely out of the concrete filling. 

•  Wait for the concrete to harden, then remove the 2 nuts. 

 

ATTENTION!

 

If the installation location is subjected to flooding, the base plate must be placed high enough to 
avoid the water reaching the operator. 

 

Summary of Contents for MT/604

Page 1: ...es RoHS 2011 65 UE Generic reference standards Household and similar electrical appliances safety part 1 generic standards EN60335 1 2013 Electromagnetic compatibility immunity part 2 generic standard...

Page 2: ...IRONMENTS 1 Verify the presence of an isolating switch upstream the installation with an open contact clearance of 3mm or higher 2 Before operating any wiring switch OFF the isolating switch the 0 sym...

Page 3: ...SE PLATE A Screw one nut onto each of the 2 J bolt until it is positioned 35mm from the end Fit the J bolts through the holes in the base plate Screw another nut onto each J bolt without tightening B...

Page 4: ...ating the grub screws Fit the washers onto the J bolts then screw the 2 nuts without tightening them completely These nuts will have to be tightened only after the definitive placement of the tooth ra...

Page 5: ...plates width is covered Fix the bars using self tapping M6 screws not supplied Upon completion of the installation vertically adjust the rack position through its slots so that moving manually the lea...

Page 6: ...e differences it is advised to control the actual leaf stop positions both is summer and in winter B FASTENING Once found the correct position fasten the closing sliding plate to the tooth rack using...