MAINTENANCE
CY72 01/08
Maintenance Section 5-3
© 2008 Alamo Group Inc.
MAINTENANCE
Gearbox Lubrication (Figure Mnt-0001 and Mnt-0011)
The Gearbox was filled with oil at the factory.
However, it is necessary that the operator check the
Gearbox before operations. The oil should be up
level of the Test Plug on the side of the Gearbox.
The Filler/Breather Plug is on the top of the
Gearbox. Fill through this Plug.
Check the oil level after operating long enough for
warmed oil to flow through the Bearings into the
lower Gearbox cavity. Refill to the test plug level.
Check the oil again before operation, after every 40
hours of mowing, and at the beginning and end of
each mowing season.
NOTE:
Overfilling the Gearbox will cause
pressure to build up and cause Oil Seals to leak.
ATTENTION
: If the Gearbox suddenly starts
making an unusual noise, stop at once, check for
leaks, and refill Gearbox as required.
Required lubricant for CY72 is a SAE 85W140T
(PN 00765444). Use gear lube with EP additives
for extreme pressure and temperature, with a AP:-
GI-5 Service rating. This lube also has tack agent
added so oil adheres to parts when box is not
running.
(Figure Mnt-0011)
. Gearbox capacity is 2
Quarts.
Summary of Contents for CY72
Page 7: ...Safety Section 1 1 2008 Alamo Group Inc SAFETY SECTION...
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ...Introduction Section 2 1 2008 Alamo Group Inc INTRODUCTION SECTION...
Page 75: ...Assembly Section 3 1 2008 Alamo Group Inc ASSEMBLY SECTION...
Page 83: ...Operation Section 4 1 2008 Alamo Group Inc OPERATION SECTION...
Page 125: ...Maintenance Section 5 1 2008 Alamo Group Inc MAINTENANCE SECTION...
Page 133: ......
Page 136: ...CY 72 SOM 01 08 P N 00757419C Printed U S A CY 72 ROTARY CUTTER...