Installation, Start Up and Shut Down DF-745SG
19
cell is isolated, establish process flow via the Main menu. See page
37.
e. Use the regulator to adjust the flow through the cell to 1 slpm (2
scfh) as shown on the flowmeter behind the front door. NOTE:
This flow rate may be reduced to minimize gas consumption but the
flow rate will directly impact the overall system speed of response.
4.2.3 Download System Data
The final step of the installation, after a couple days of dry down, should be to
download the system data (see page 63), and send them by e-mail to your local
Business or Technical Center for review. This will allow the factory to confirm that
the analyzer is working properly by comparison with data stored at the time of
shipment, and in addition will set a baseline for comparison with future downloads,
if any.
4.3 Analyzer Shut Down
In order to minimize the time required for the analyzer to re-achieve a zero
baseline on start up, the following steps should be followed when shutting the
analyzer down.
Short Term Shut Down
- A short-term shut down, for example to move and
restart the analyzer, can be accomplished by simply shutting off the power switch
behind the front door. This action initiates the standard isolation process (for
analyzers equipped with gas control valves) and computer shut down which takes
approximately 40 seconds.
Long Term Shut Down
– For analyzers with gas control valves, from the Main
Menu go to System, and select Isolate Analyzer. A routine automatically starts that
closes the downstream valve and allows pressure to build in the moisture cell after
which an upstream valve closes as well. Throughout this process a message
appears over the display instructing the user to wait 40 seconds. Once complete,
the message disappears and the user may shut the power off with the switch behind
the front door that initiates the computer shut down sequence that takes an
additional 40 seconds.
Additional long-term isolation security can be achieved by closing the valve on the
rotameter on the rear of the instrument as well as completely closing the sample
inlet regulator.
If the analyzer is being disconnected from gas, be sure to tightly cap all gas
connections.
On analyzers that have no gas control valves:
1. Wait a few minutes to allow positive pressure to build in the moisture cell.
2. Be sure to tightly cap all connections.
Summary of Contents for NanoTrace DF-745SG
Page 1: ...NanoTrace Moisture Analyzer DF 745SG OPERATOR MANUAL ...
Page 4: ......
Page 12: ......
Page 18: ......
Page 28: ......
Page 30: ...24 DF 745SG Options ...
Page 72: ......
Page 74: ......
Page 80: ......
Page 82: ......
Page 86: ...80 DF 745SG Appendix A User Menu Screens Page 47 Page 49 Page 52 Page 53 Page 55 Page 56 ...
Page 88: ...82 DF 745SG Appendix A User Menu Screens ...
Page 93: ......