4
Multi-point synchronization
Startup
Product Manual – MOVITRANS
®
TES31A Decentralized Supply Unit Synchronization
21
To perform startup, proceed as follows:
Switch off power to network
Configure the SBus address
Connect supply system to slave
Configure the SBus address
Startup completed
Set up necessary cabling for
network units
Disconnect unit interface X5161
Switch on supply system of
designated master
Configure synchronization setting
as "MP master"
Perform further
settings as required
Configure the synchronization
setting "MP Slave"
Terminate unit interface X5161
Further
slave
available
No
Yes
31166618891
29190657/EN – 04/2020