5
Single-point synchronization
Line cable connection
Product Manual – MOVITRANS
®
TES31A Decentralized Supply Unit Synchronization
32
5.4
Line cable connection
INFORMATION
Make sure that all the synchronization stations are galvanically coupled via the con-
nected line cable(s).
INFORMATION
Refer to the following documentation for a detailed depiction of the wiring in the com-
pensation box: MOVITRANS® Compensation Box TCS31A
5.4.1
Connecting line cables to two supply units
When you are synchronizing two TES31A decentralized supply units, both the load
cables can be positioned directly in the TCS31A compensation box. The following fig-
ure shows the topology in the synchronization of two TES31A decentralized supply
units:
TES31-Slave 1
TES31-Master
X2337
X2337
TCS31A
TCS10
I
L
I
L
2 x I
L
[1]
[2]
30903003147
I
L
Load current
[1]
Two load cables
[2]
Line cable with supply and return cable
29190657/EN – 04/2020