6
Electrical connections
X2337: Load connection TLS
Product Manual – MOVITRANS
®
TES31A Decentralized Supply Unit Synchronization
54
6.4
X2337: Load connection TLS
Function
Load connection of the line cables 1 and 2
Connection type
Han
®
Q 4/2, female
Connection diagram
1
11
3
12
2
4
PE
No.
Name
Function
1
TLS1
Line cable 1
2
TLS2
Line cable 2
3
TLS1
Line cable 1
4
TLS2
Line cable 2
11
DI00
Data reception direction 00
12
/OSI
/Output stage inhibit
PE
PE
PE connection
INFORMATION
Pins 11 and 12 must be jumpered to enable the output stage. The
SEW‑EURODRIVE cable that is configurable in length comes equipped with this
jumper. In device variants with 2 load connections, you have to jumper pins 11
and 12 at both sockets.
6.4.1
Connection cable/cable lug M8
Cable
Length/installation
type
Component
Part number: 18182313
Cable design: (5G6)
Han
®
Q 4/2, male ↔ cable lug M8
Variable length
TES
TCS31A
Cables are labeled according to the pin number of the connector.
Use in the synchronization of two units (direct connection to TCS31A).
29190657/EN – 04/2020