The instrument can be delivered in two versions:
z
Version
HP (full equipment),
suitable for Preliminary test, Main test, Test of working order
(serviceability determinations) and Regulator inspection
z
Version LP (basic equipment),
suitable for Main test, Test of working order and Regulator
inspection.
2.1
Connections
CAUTION!
Only members of staff who are familiar with the legal
requirements (in Germany: TRGI) are permitted to
connect and operate the instrument.
The instrument can be connected to the gas installation with the
help of three quick-release connections (see illustration in the
appendix):
z
Inlet for
Main test, Test of working order and
Regulator inspec-
tion
z
Inlet for
Preliminary test (not available for the LP version)
z
Outlet for Test of working order.
Note:
The quick-release connections allow only are de
-
signed in such a way that they allow only to con-
nect tubes which are suitable for the appropriate