5. If replacing batteries disconnect them from the PCB by removing the three connectors - see figure 12. If installing batteries
to a base without batteries, skip step 5 to 7.
6.
Remove four screws, to release the battery bracket (two TX25 and two TX20) - see figure 12. If necessary, remove wire
clips and wires to access the screws.
7.
Remove the bracket holding the batteries in place. If replacing battery/batteries, subsequently take out the battery/batteries
- see figure 12.
8.
Install or replace the new battery/batteries - see figure 12.
9.
Install the battery bracket holding the batteries in place. The bracket will come with the batteries in case of installing batteries
to a base without batteries.
10.
Reverse the procedures in step 6 to 1.
11. CAUTION:
When assembling the base by fitting the top part of the base back onto the bottom part, be careful not to pinch
or compromise any cables or damage the gasket when re-assembling the base.
12.
It is important to ensure that the base unit is vacuum tested once the base unit has been fully re-assembled to comply with
the IP65 requirements.
NB! The base unit is vacuum tested through the head unit.
•
Only use the SGM Vacuum Test Kit, or contact your local SGM dealer if no test kit is available.
• Attach the head unit onto the base unit.
•
Prepare the head for vacuum test by removing rear plastic cover on the head.
•
Remove the plug from the vacuum connection on the rear of the head.
•
Connect the vacuum Test kit to the vacuum connection on the rear of the head.
•
Perform the vacuum test as outlined in the software for the SGM Vacuum Test Kit and re-mount the plug and plastic cover.
IMPORTANT:
If you install only one battery in the G-1 Beam fixture, it is important that you connect that battery to the number 1
connector on the PCB. If you install more than one battery, the connection order is irrelevant as long as the number 1 connector on
the PCB is used by one of the batteries installed. If you do not follow this procedure, the G-1 Beam fixture will not function properly.
Battery 1
Battery 2
Battery 3
TX25
TX25
TX20
Step 6
TX20 (behind the wires)
Step 6
Step 6
Step 6
Step 5
PCB connector 1 / Battery 1
PCB connector 2 / Battery 2
PCB connector 3 / Battery 3
Battery bracket
Step 7
Step 8
Figure 12: Installing G-1 Beam batteries IV
Summary of Contents for G-1 BEAM
Page 1: ...USER MANUAL MOVING HEADS SERIES G 1 BEAM G 1 BEAM POI ...
Page 30: ...30 User Notes ...
Page 31: ...31 User Notes ...