background image

2. Graphic Symbols 

BE SURE THAT YOU UNDERSTAND ALL OF THESE SYMBOLS BEFORE 

OPERATING THE UNIT. 

Important operating and / or maintenance instruction. 
Read the accompanying text carefully. 

This symbol indicates items and procedures that are STRICTY 
PROHIBITED with regards to the unit. 

Potential electrical hazards. 

Explosive. 

No disassemble. 

Flammable. 

Hot surface or steam. 

Summary of Contents for SH-FU-100LTG-WG

Page 1: ...ersion 2021Rev 0 Tel 82 42 826 5172 E mail i sales samheung21 com Sejong si Republic of Korea www samheung21 com SH FU 50 80 100 120STG WG SH FU 50 80 100 120LTG WG 1200 C TUBE FURNACE Gas Flow Packag...

Page 2: ...f the unit Use the unit only in the way described in this manual Failure to follow the instruction in this manual may cause wrong operation 1 General Description 2 Graphic Symbols 3 The Outward 4 Key...

Page 3: ...our quality product We stand behind our products and want to let you know we are here if you need us Before you use the unit read this entire manual carefully to understand how to install operate and...

Page 4: ...ING THE UNIT Important operating and or maintenance instruction Read the accompanying text carefully This symbol indicates items and procedures that are STRICTY PROHIBITED with regards to the unit Pot...

Page 5: ...5 3 The Outward 50 80 100 120LTG 50 80 100 120STG...

Page 6: ...and time Multi key in 100 DIN Pt100 KPt100 JPt100 K CA Precise temperature control Alarm when timer ends Auto back up Over temperature protection function FU xxTG Separated body and control box desig...

Page 7: ...e the product is delivered place the package on a flat location Unscrew the bottom of the box Lift the box as shown in the picture Unwrap the bag Place the equipment on your desired location Lift the...

Page 8: ...t by adjusting the feet Serial label shows the electric power specification of the unit Connect power and turn on the main switch E L B Please do not raise up it high temp at once It case to decline d...

Page 9: ...all parts are in the package 1 panel of 1 Flowmeter and valve 3 pipe lines with nuts 1 Gas gauge with valve Fig 3 In case of Pipe parts for 2 gas channels 1 panel of 2 Flow meters and valves 4 pipe l...

Page 10: ...10 2 Screw down the panel of flow meter and valve connect 3 pipe lines each Fig 4 5 6 Tighten the each bolt and nut with spanner Fig 4 Fig 5 Fig 6...

Page 11: ...11 1 Controller 6 Setting and Operation LCD display Program mode lamp Heater lamp Timer lamp Auto tune lamp Local mode lamp Shift button Mute Setting Program Local Mode Start Stop...

Page 12: ...time 2 Set Temp and Time with and save it with pressing 3 Push to start running Heater lamp is on and Timer lamp will blink until PV reaches to SV and be on when PV reaches to SV PV current temp SV Ta...

Page 13: ...time to target temp SV Target temp TM Holding time at target temp 1 Press for 5 sec and to change to Program mode When it shift to Program mode PRG lamp is on If you want to shift to Local mode just p...

Page 14: ...n after completing the saved pattern MANU It shift to Local mode after completing the saved pattern NEXT It moves to next pattern operation mode after completing the saved pattern 7 Press to save and...

Page 15: ...STG WG SH FU 100STG WG SH FU 120STG WG Furnace SH FU 50STG SH FU 80STG SH FU 100STG SH FU 120STG Components Gas Flowmeter 1EA Stainless Steel Pipe Connector Gas Sealing Mask Quartz Tube Length 1000 mm...

Page 16: ...LTG WG SH FU 100LTG WG SH FU 120LTG WG Furnace SH FU 50LTG SH FU 80LTG SH FU 100LTG SH FU 120LTG Components Gas Flowmeter 1EA Stainless Steel Pipe Connector Gas Sealing Mask Quartz Tube Length 1200 mm...

Page 17: ...Memo...

Page 18: ...Memo...

Page 19: ...19 www samheung21 com...

Reviews: