2
C
4"
4"
6"
RK-42S24:
HEIGHT :
16
3
/
4
" to 17"
WIDTH
:
24
3
/
8
" to 24
11
/
16
"
DEPTH :
minimum 20"
HEIGHT :
15
11
/
16
" to 16"
WIDTH
:
22
1
/
16
" to 22
3
/
8
"
DEPTH :
minimum 19
1
/
4
"
*RK-51S27,
*RK-51K30,
*RK-51S30 &
*RK-51W30
1. Place the EXHAUST DUCT ASSEMBLY in the
opening. When the EXHAUST DUCT ASSEMBLY
is in the opening correctly, its flanges will be tightly
against the lower edge of the opening. See
Sketch 2.
2. Secure the EXHAUST DUCT ASSEMBLY with two
SCREWS B. See Sketch 2.
Sketch 1
Sketch 2
A
B
STEP 2
EXHAUST DUCT ASSEMBLY INSTALLATION
STEP 1
CABINET OR WALL OPENING
SCREW B
SCREW B
EXHAUST
DUCT ASSEMBLY
The opening in the wall or cabinet must be within the
following dimensions:
Outlet should NOT be in the shaded area as indicated
on Sketch 1.
NOTE 1: If the dimension of DEPTH (C) is more than
21", the outlet location may be any area on the
rear wall.
NOTE 2: The floor of the opening should be constructed
of plywood strong enough to support the
weight of the oven and floor load (about 100
pounds). The floor should be level for proper
operation of the oven. Be sure to check the
local building code as it may require that the
opening be enclosed with sides, ceiling and
rear partition. The proper functioning of the
oven does not require the enclosure.