122
Employee report
• Sample X report
• Sample Z report
Total labor cost
Overtime
Total hour
Total working time
per location
Edited time
Break-out
Employee name
Job location name
Time-out
Break-in
Job location no.
Range
Employee code
Time-in operation
time
Operation
Total cost per
location
Total break time
per location
Date
The subsequent printout occurs
in the same format as in the
sample X2 report.
Over time report
• Sample X report
Range
Employee code
Date
Over time (Hour)
Over time cost
The subsequent printout occurs
in the same format as in the
sample X2 report.
• Sample Z report