24
FU-40SE-TA
6. Removing the motor
(1) Loosen the screws (3 pcs.) fixing the motor angle
to remove it.
(2) Pull out the lead wire cover.
(3) Loosen the screw (1 pc.) fixing the electric equip
ment box cover to remove it.
(4) Pull out the connector C of the power supply PWB
and take out the motor.
7. Removing the high-voltage unit ass’y
(1) Remove the screws (2 pcs.) fixing the cluster.
(2) Pull out the connectors J and K to remove the
high-voltage unit ass’y from the casing.
[Cautions when replacing the high-voltage unit ass’y]
Never touch the discharging parts (ceramic panel)
with bare hands. No dust or oil of your hands must
be adhered to the high-voltage unit ass’y.
(They may hamper the emission of the ion.)
Always hold the case (resin) with clean gloves
duringthe replacement.
Should you touch the unit, wipe it off with alcohol.
Never forget to unplug the unit before the operation.
Confirm fully the connection of the high-voltage
harness and the relay harness.
Install the high-voltage harness and the relay harness
so that they will not come to contact with each other.
8. Removing the motor thermal fuse
(1) Remove the motor from the casing and then the
thermal fuse ass’y from the groove of the casing.
The following diagram shows the installation posi
tion of the thermal fuse ass’y.
9. Removing the power supply PWB
(1) Pull out the connector on the power supply PWB
to remove the PWB.
Screw
Connector 2
Cluster fasten guide
Connector 1
A
A
B
Motor side
The attachment position of Fuse is carried out as follows.
A temperature fuse ass'y should be located in the center of rib-B.
(The terminal of a temperature fuse ass'y should be located in
an rib-A outdoors side.)
Temperature
fuse ass'y
Temperature
fuse ass'y
Terminal
Terminal
Connector C
Connector D
Connector B
Connector A
Relay PWB
harnnes
Screw
Screw
Control box
(upper)
Lead wire
cover
Motor angle
Screw
Motor
Temperature
fuse ass'y
It passes through the outside
of the boss in the casing.