IM-DR580H
– 7 –
1
Bottom Cabinet
1. Remove the rechargeable .
7-2
battery cover as indicated
by the arrow.
2. Screw ..................... (A1) x5
7-1
2
Main PWB
1. Screw ..................... (B1) x2
7-2
2. Screw ..................... (B2) x1
3. Flexible PWB .......... (B3) x3
3
Top Cabinet
1. Open the Top cabinet.
7-1
2. Screw .................... (C1) x4
7-2
4
MD Mechanism
1. Remove the center cabinet
7-3
as indicated by the arrow.
2. Screw .................... (D1) x1
5
Operation Button 1. Screw ...................... (E1) x1
7-4
Flexible PWB Ass'y
DISASSEMBLY
Cares before disassembling
When assembling the machine after disassembling or
repair, observe the following requirements so as to ensure
safety and performance.
1. Remove the batteries from the machine, and take out the
mini-disc.
2. When assembling after repair, be sure to position the
wires in the same location.
Use the specified screws to fix the cabinet and the
mechanism unit. The use of the screws with length other
than specified may cause contact with the mechanism
unit resulting in malfunction.
3. When repairing, pay close attention so not to damage the
IC from static electricity.
REMOVAL
PROCEDURE
STEP
FIGURE
Figure 7-1
Figure 7-2
Figure 7-4
Caution:
Carefully handle the main PWB and flexible PWB. After removing the
flexible PWB (1*) for the optical pickup from the connector, do not
touch directly the front end of flexible PWB with your hand so as to
prevent damage of optical pickup by static electricity.
Figure 7-3
Top Cabinet
Bottom Cabinet
EJECT Knob
(A1)x2
ø1.4x1.5mm
(A1)x1
ø1.4x1.5mm
(A1)x1
ø1.4x1.5mm
(A1)x1
ø1.4x1.5mm
(B1)x2
ø1.4x2.5mm
Pull
Pull
Pull
Pull
Pull
Pull
Battery
Cover
Center Cabinet
Top Cabinet
Main PWB
1
2
(B3)x1(1*)
(B3)x1
EJECT Frame
Ass'y
(B3)x1
(C1)x2
ø1.4x1.5mm
(B2)x1
ø1.4x1.5mm
(C1)x2
ø1.4x1.5mm
MD Mechanism
(D1)x1
ø1.4x1.5mm
Center
Cabinet
EJECT Frame
Ass'y
Main Frame Ass'y
(E1)x1
ø1.4x1.5mm
Operation Button
Flexible PWB Ass'y
Top Cabinet
Main Unit
Summary of Contents for IM-DR580H(BK)
Page 62: ...IM DR580H 62 M E M O ...