MX-3610N MX-LC11 (LARGE CAPACITY TRAY) 20 – 3
2)
Check to insure that the height adjustment check rib of the
large capacity tray unit and the axis line of the mounting plate
upper mounted to the main unit are in the same line.
3)
If the height adjustment is not required, insert the large capac-
ity tray unit further more.
If the height adjustment is required, perform the adjustment
procedures from 4).
4)
Loosen the adjustment screw on the F side.
Use the adjustment screw on the front side for the adjustment.
Do not touch the screw on the rear side.
If the screw is loosened or removed when servicing, be sure to
execute “C. Height adjustment” after completion of servicing.
5)
In the case of a shift to the right, press the front upper section
and fit the height adjustment check rib so that it is in the same
line with the axis line of the mounting plate upper. Insert the
large capacity tray unit into the main unit.
6)
In the case of a shift to the left, lift the grip so that the height
adjustment check rib is in the same line with the axis line of the
mounting plate upper, and insert the large capacity tray unit.
[Shift to the left]
[Shift to the right]