2
INSTALLATION PREPARATION
MATERIALS FOR NEW INSTALLATIONS
ONLY:
NAME & DESCRIPTIONS
PARTS
Air Gap for Drain Hose, if required
Waste Tee for House Plumbing, if
applicable
Electrical Cable or Power Cord,
if applicable
Screw Type Hose Clamps
Strain Relief for Electrical
Connection
Hand Shut-off Valve
Hot Water Line
3
/
8
" minimum Copper
Coupler for Extending Drain Line, if
applicable
TOOLS REQUIRED:
NAME & DESCRIPTIONS
PARTS
Phillips Head Screwdriver
5
/
16
" and
1
/
4
" Nut Driver
6" Adjustable Wrench
Level
Carpenter's Square
Measuring Tape
Safety Glasses
Bucket to catch water when
flushing the line
Gloves
FOR NEW INSTALLATIONS ONLY:
NAME & DESCRIPTIONS
PARTS
Tubing Cutter
Drill and Appropriate Bits
Hole Saw Set