background image

Wiring ProCharger™ CR cable junction box 

Waterproof 1⁄2” cable fitting or conduit fitting

Cover the module with an opaque 

material during installation

Installing a ProCharger™ CR 

junction box

Match the polarities of the

cables and terminals when

making the connections.

Opening the junction box

The ProCharger™ - CR junction box has 

four captive screws that secure the lid to 

the base. To remove the lid, loosen the 

screws with a small flat or Phillips screw-

driver.

Once wiring is complete, install the 

junction box lid and tighten screws to 

0.5 - 0.7 Nm (4 - 6 in-lb.). 

Caution, DO NOT OVERTIGHTEN 

  the lid screws.

Do not use sealant to bond lid to its base.

Wiring

Remove the knockout plug from the entry 

by carefully punching it out with a screw-

driver.

Slide the foam seal into the cavity behind 

the cable entry and press it down using a 

screwdriver.

Strip 16 mm of insulation from the end 

of the wire. Wire size must range from 8 

AWG - 14 AWG (1.5-10 mm²)

Pass

 only one

 wire through the wire entry 

by pressing it through the foam seal.

Route the wire around the strain relief, 

and then pass the bare end between the 

clamping plate and the washer of the 

screw. Tighten the screw to a maximum 

torque of 2.3 Nm.

Waterproof 1⁄2” cable fitting or 

conduit fitting

You will need a UL-approved 1⁄2” cable fit-

ting. Refer to the manufacturer’s instructions.

Remove the knockout plug by placing the 

tip of a screwdriver at the edge of the 

plug and striking the screwdriver with a 

hammer. 

Attach the fitting to the junction box and 

leave it loose.

Pass the wire through the fitting and route 

it to a terminal. Be careful to select the 

proper polarity.

Insert the wires between the clamp-

ing plates and the washer of the screw. 

Tighten the screw to a maximum torque of 

2.3 Nm.

Tighten the fitting.

The same procedure should be used 

for a conduit fitting.

Interconnecting several modules with 

ProCharger™ cable junction boxes

Use conduit fittings in all places 

where the wiring is accessible to 

children or small animals.

Series circuit: 

Connect the negative terminal of each 

module to the positive terminal of its adja-

cent module.

Fasten loose lengths of wiring using UV- 

and weather-resistant cable clamps.

At the first and last modules in the series, 

replace the regular cable fitting for the 

wire leading away from the module with 

a conduit fitting. To remove the fitting, 

loosen its lock nut.

If a regular cable fitting is present at the 

first and last modules of the series, replace 

it with a conduit fitting.

Parallel circuit see “Comparison of series and 

parallel wiring“, page 8.

Use a conduit fitting that can be used to route 

the cable leading from each module group 

connected in parallel.

After making the electrical 

connections …

Replace the covers on the 

 

junction boxes and carefully 

 

tighten the four retaining screws 

 

(0.5-0.7 Nm). Do not apply any 

 

supplementary sealant to the 

 

junction boxes.

10

11

Summary of Contents for SP150-L

Page 1: ...Shell Solar Installation Guide for Shell Solar Photovoltaic Modules www shell com solar First Edition 2003...

Page 2: ...service WARNING All instructions should be read and understood before attempt ing to install wire operate and maintain the module Contact with electrically active parts of the module such as terminals...

Page 3: ...rk only under dry conditions and use only dry tools Observe the safety regulations for all other components used in the system including wiring and cables connectors charging regulators inverters stor...

Page 4: ...dancewithlocalcodesortheNationalElectricalCode Consultlocalauthoritiesfor permit installationandinspectionrequirements Consultmanufacturerforproperinstallationonspecial vehiclessuchasboatsandcamper Pr...

Page 5: ...ulations when installing modules on roofs and buildings and use prescribed safety equipment safety nets lifelines etc Mounting hole locations For secure installation use only the recom mended mounting...

Page 6: ...mounting system Provide adequate rear ventilation For proper operation and to avoid damage from condensation the module requires an adequate flow of air across the rear surface When installing the mod...

Page 7: ...s the charging current automatically adjusts to suit the charge state of the battery and the power consumption of the connected loads When using a self regulating module make sure there is sufficient...

Page 8: ...r system Please observe the following Keep cable length as short as possible to reduce efficiency voltage drop If you connect several modules together secure the wiring to the support frame Where poss...

Page 9: ...can cause damage to the bypass diode in the module a risk of explosion due to excessive gas generation in the battery Grounding Ground the modules and the support frame Modules with frames have a pre...

Page 10: ...emove the knockout plug by placing the tip of a screwdriver at the edge of the plug and striking the screwdriver with a hammer Attach the fitting to the junction box and leave it loose Pass the wire t...

Page 11: ...ket pass a short cable tie through the slot and secure the cable tie After making the electrical connections Replace the covers on the junction boxes and carefully tighten the four retaining screws 0...

Page 12: ...any problems arise have them be inves tigated by an authorised specialist Observe the maintenance instruc tions for all components used in the system such as support frames charging regulators invert...

Page 13: ...acting the diode lead Note the orientations of the polarity markings on the diodes Check the conductivity of the diodes They should conduct electricity when the test leads are connected in one directi...

Page 14: ...or for reshipment of any repaired or replaced PV modules or cost associated with installation removal or reinstallation of the PV modules D When used in non land based applications the Limited Peak Po...

Page 15: ...DE ALL OTHER EXPRESS OR IMPLIED WARRANTIES INCLUDING BUT NOT LIMITED TOWARRANTIESOFMERCHANTABILITYANDOFFITNESS FOR PARTICULAR PURPOSE USE OR APPLICATION AND ALL OTHER OBLIGATIONS OR LIABILITIES ON THE...

Page 16: ...0 2211 Shell Solar Industries 4650 Adohr Lane Camarillo CA 93011 United States Fax 1 805 388 6395 Shell Solar Pte Ltd 72 Bendemeer Road Hiap Huat House 07 01 Singapore 339941 Fax 65 6842 3887 Status 0...

Reviews: